3 floors · 4 apartments · 5,412 sq ft · built 1930 · class C3 · owner of record: Jlw Properties Management, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 7, 2026 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OBSERVED VIEWING PANELS COVERED UP, FENCE POORLY MAINTAIN@ EXP. 1, 3307.7.3 VIEWING PANELS: SHALL BE BLOCKED WITH NON-FRANGIBLE ACRYLIC PANELING OR EQUIVALENT MATERIAL.BC 3307.7 TH #39556277J | Nov 13, 2026 | $1,000 |
| Mar 27, 2026 | Construction CLASS - 2 JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. AT THE TIME OF INSPECTION OBSERVED SITE FULLY ERECTED CONSTRUCTION FENCE @ EXP. 1 MISSING HUNTER GREEN 3307.7.9. FENCES ERECTED ON OR AFTER J #39552320H | Jun 22, 2027 DEFAULT | $2,500 |
| Feb 6, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED TEMPORARY CONSTRUCTION FENCE IN PLACE AT EXPOSURE #1 WITH EXPIRED PERMIT SINCE 10/31/24 UNDER B00607878-I1-FN, UPON REVIEW DEPARTMENT OF RECORDS TO SEARCH FOR A VALID FENCE PERMIT #39536730K | Feb 12, 2026 IN VIOLATION | $625 |
| Feb 6, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OF 4 STORY ENLARGEMENT ALT SITE OBSERVED PEDESTRIAN PROTECTION SIDEWALK SHED IN PLACE. UPON INSPECTION SIDEWALK SHED DOES NOT MEET CODE SPECIFICATION THE DECKING OF THE SHED IS NOT FULLY E #39536731M | Aug 3, 2026 DEFAULT | $5,000 |
| Aug 26, 2024 | Construction CLASS - 2 . AT TIME OF INSPECTION, I OBSERVED MONITORING BEING DONE ON AN EXCAVATION / FOUNDATION SITE. UPON REQUESTING THE PRE-CONSTRUCTION SURVEY AND MONITORING REPORT FOR OPTICAL MONITORING, NONE WAS PROVIDED. #39531814P | Nov 6, 2024 IN VIOLATION | $1,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 7, 2026 | ECB | Construction: AT THE TIME OF MY INSPECTION OBSERVED VIEWING PANELS COVERED UP, FENCE POORLY MAINTAIN@ EXP. 1, 3307.7.3 VIEWING PANELS: SHALL BE BLOCKED WITH NON-FRANGIBLE ACRYLIC PANELING OR EQUIVALENT MATERIAL.BC 3307.7 TH | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 6:09 PM ET. BBL 3006400052.