3 floors · 166,790 sq ft · built 1931 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3946). Agency page | Dec 31, 2026 in 47 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 166,790 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-24 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 8, 2026 | Construction CLASS - 2 REISSUE ECB#35721455Y ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2.NOTED:TEMPORARY COFO#2041211 6/6/2022 NO RENEWAL OR FINAL UP UNTIL PRESENT DAY OBSER #35733042Y | May 29, 2026 POP/IN-VIO | $0 |
| May 8, 2026 | Construction CLASS - 2 28-301.1 UNLAWFUL PLACEMENT OF FURNISHINGS DECORATIONS OR OTHER OBJECTS AT EXITS THAT OBSTRUCT ACCESS TO EGRESS FROM OR VISIBILITY THERE OF PER FDNY 2008 CODE;FC 1027.4.NOTED:FURNISHINGS OBSTRUCTING EMERGENCY E #35733045J | May 29, 2026 POP/IN-VIO | $0 |
| May 8, 2026 | Construction CLASS - 2 REISSUE ON ECB#35721453K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGE LIGHTS AND E #35733044H | May 29, 2026 POP/IN-VIO | $0 |
| May 8, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:STORAGE IN ELECTRICAL PANEL ROOM WITH MISCELLANEOUS ITEMS CONSISTING OF CLEANINGEQUIPMENT,CLEANING PRODUCTS BOXES LADDERS,DESKS ETC-IN ROOM 1469ST FLO #35733046L | May 29, 2026 POP/IN-VIO | $0 |
| May 8, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATEDCLASSROOMS AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINDING MISSING ANDOR FAULTY HARDWARE ON CLASSROOMS.340,337,329,313,307,223,227,229B,232 #35733047N | May 29, 2026 POP/IN-VIO | $0 |
| May 8, 2026 | Construction CLASS - 2 REISSUE ON ECB#35721454M EXIT DOOR NOT SELF-CLOSING.NOTED:EMERGENCY EXTERIOR EXIT DOORS NOT SELF-CLOSING DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON EXTERIOR EXIT DOOR ON EXITS #2,#5,#7,#10 AND EXIT 11 OBS #35733043X | May 29, 2026 POP/IN-VIO | $0 |
| Jul 22, 2025 | Construction CLASS - 2 REISSUE ECB#35684964M EXIT DOOR NOT SELF CLOSING.NOTED:AT 3RD FL STAIRB 2ND FL STAIR D 1ST FL EXIT H,10,AUDITORIUM STAIR F,C DOORS ARE IN DISREPAIR NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR. #35721454M | Sep 5, 2025 POP/IN-VIO | $0 |
| Jul 22, 2025 | Construction CLASS - 2 REISSUE ECB#35684962Z ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2.NOTED:TEMP COFO#2041211 6/6/22 WITH NO REVIEW OR FINAL ISSUED.REM:OBTAIN A VALID COF #35721455Y | Sep 5, 2025 POP/IN-VIO | $0 |
| Jul 22, 2025 | Construction CLASS - 2 REISSUE ECB#35684965Y FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL AUDITORIUM & CAFETERIA EMERGENCY LIGH #35721453K | Sep 5, 2025 POP/IN-VIO | $0 |
| Sep 24, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.OBSERVED AT 1 FLOOR EXIT 10,MULTI-PURPOSE,AUDITORIUM EMERGENCY LIGHTS AND EX #35684965Y | Nov 29, 2024 POP/IN-VIO | $0 |
| Sep 24, 2024 | Construction CLASS - 2 REISSUE#35672245H ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2.OBSERVED 3 STORY SCHOOL NO C/O VALID.REM:OBTAIN A VALID COFO OR DISCONTINUE ILLEGAL OCCU #35684962Z | Nov 29, 2024 POP/IN-VIO | $0 |
| Sep 24, 2024 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.OBSERVED AT 3 FLOOR STAIR SMOKE A,B,D,G,H 1FL STAIR (S)D,1 FL EXIT(S) 7,9,11,STAIR F BY EXIT 15 AND EXITS 10,11 AND 12.DOORS ARE NOT CLOSING PROPERLY.REM:REPAIR/REPLACE DOOR. #35684964M | Nov 29, 2024 POP/IN-VIO | $0 |
| May 24, 2023 | Construction CLASS - 2 ALTERED/ CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1- 28118.3.2. NOTE: OBSERVED THE 3 STORY OCCUPIED SCHOOL BUILDING WITH TEACHERS, STUDENTS, AND STAFF HAS NO VALID C OF #35672245H | Sep 1, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06938 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06936 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06937 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06939 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 10:58 AM ET. BBL 2039460007.