6 floors · 65 apartments · 66,474 sq ft · built 1927 · class D1 · owner of record: Creston Holding Company
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 66,474 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3161). Agency page | Dec 31, 2031 in 1887 days | Next due 2031 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-11 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 26, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#341489 VIO#070925PI20503SB DATED 07/09/2025 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF TODAY 09/26/25 THERE IS NO PERMIT ISSUED IN DOB-BIS OR DOBNOW TO REPR BLDG. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#341489 VIO#070925PI20503SB TO REPAIR BLDG U #PI20504SB | DOB VIOLATION - ACTIVE |
| Jul 9, 2025 | CONSTRUCTION FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD @ EXP3&4 SPALLING MASONRY & DETERIORATED MORTAR JOINTS @ MULT LOCATIONS. ON ROFF OBSVD CRACKED STUCCO @ BULKHEAD. DETERIORATED MORTAR JOINTS @ COPING STONES. OWNER TO IMMED RETAIN A NYSPE TO EVAL THE ENTIRE BLDG, DETERMINE THE STRUCT STAB & PREPARE/FILE REPA #PI20503SB | DOB VIOLATION - ACTIVE |
| Dec 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 #00998 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #14066 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #15314 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 18, 2026 | B | Apt 1H · 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF ENTIRE APT 5B AT 5TH STORY IS INFESTED WITH FLIES CAUSING HEALTH HAZARD IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Jun 22, 2026 |
| May 18, 2026 | B | Apt 1H · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM WEST AT NOR | Jun 22, 2026 |
| May 18, 2026 | B | Apt 1H · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM WEST AT N | Jun 22, 2026 |
| May 18, 2026 | B | Apt 1H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILE IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Jun 22, 2026 |
| May 18, 2026 | B | Apt 1H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Jun 22, 2026 |
| May 18, 2026 | C | Apt 1H · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE AT DOOR IN THE ENTRANCE LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Jun 1, 2026 |
| Jun 29, 2023 | B | Apt 2L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2L, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Aug 3, 2023 |
| Jun 29, 2023 | B | Apt 5J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5J, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST | Aug 3, 2023 |
| Jun 29, 2023 | B | Apt 6E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6E, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 3, 2023 |
| Jun 29, 2023 | B | Apt 3C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 3, 2023 |
| Jun 29, 2023 | B | Apt 4L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Aug 3, 2023 |
| Jun 29, 2023 | B | Apt 2K · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2K, 2nd STORY, 5th APARTMENT FROM SOUTH AT WEST | Aug 3, 2023 |
| Jun 26, 2023 | C | Apt 3K · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jun 30, 2023 |
| Jun 26, 2023 | C | Apt 3K · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jun 30, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 11:26 PM ET. BBL 2031610010.