| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 33,740 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 789 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-17 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 7, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED:INSTALLATION OFILLEGAL HARDWARE KICK STOPS ON FIRE RATED DOORS AT CORRIDOR 131A,CORRI #35735064Y | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 7, 2026 | Construction CLASS - 2 EMERGENCY SIGNS AT ELEVATOR CALL STATIONS MISSING,DEFECTIVE OR NON-COMPLIANT WITH SECTION REQUIREMENTS.NOTED:EMERGENCY ELEVATOR CALL STATIONS MAP MISSING ON SECOND FLOOR OBSERVED UPON INSPECTION.REM:INSTALL AND #35735062K | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 7, 2026 | Construction CLASS - 2 REISSUE ON ECB#35693374R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGE EXIT AND EXI #35735061Z | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 7, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:STORAGE INELECTRICAL SWITCH GEAR ROOM WITH TOILET PAPER CASES,COMBUSTIBLES,BATTERIES,JANTORIAL PRODUCTS,GARBAGE CANS AND VACUUMS OBSERVED UPON INSPECT #35735063M | Aug 24, 2026 POP/IN-VIO | $0 |
| Sep 3, 2025 | Construction CLASS - 2 REISSUE#35688961P FAILURE TO MANTAIN BUILDING IN CODE COMPLIANT MANNERILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY LIGHTS NOT WORKING WHEN TESTED THROUGHOUT V #35693374R | Sep 4, 2025 POP/IN-VIO | $0 |
| Sep 19, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED APPROX. 50% OF EMERGENCY LIGHTS WITH BATTERY BACK UP POWER NOT WO #35688961P | Oct 21, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #04151 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #02348 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #03604 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #02506 | DOB VIOLATION - ACTIVE |
| May 13, 1992 | CONSTRUCTION #D4JG03 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 7, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED:INSTALLATION OFILLEGAL HARDWARE KICK STOPS ON FIRE RATED DOORS AT CORRIDOR 131A,CORRI | Open |
| Aug 7, 2026 | ECB | Construction: EMERGENCY SIGNS AT ELEVATOR CALL STATIONS MISSING,DEFECTIVE OR NON-COMPLIANT WITH SECTION REQUIREMENTS.NOTED:EMERGENCY ELEVATOR CALL STATIONS MAP MISSING ON SECOND FLOOR OBSERVED UPON INSPECTION.REM:INSTALL AND | Open |
| Aug 7, 2026 | ECB | Construction: REISSUE ON ECB#35693374R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGE EXIT AND EXI | Open |
| Aug 7, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:STORAGE INELECTRICAL SWITCH GEAR ROOM WITH TOILET PAPER CASES,COMBUSTIBLES,BATTERIES,JANTORIAL PRODUCTS,GARBAGE CANS AND VACUUMS OBSERVED UPON INSPECT | Open |