Manhattan · Block 1878 · Lot 37 · 10025

210 West 107 Street

6 floors · 53 apartments · 53,250 sq ft · built 1925 · class D1 · owner of record: 210 W 107 Street Llc

58open violations
$0ECB/OATH penalties owed
3HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 53,250 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1878). Agency page

Dec 31, 2028
in 778 days
Next due 2028
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029

Open violations

ECB / OATH (16)
IssuedViolationHearingBalance
Jan 8, 2022Construction CLASS - 1
AN UNLAWFUL ACT-FAILUE TO COMPLY W/AN ORDER OF THE COMMISSIONER.FAILURE TO CORRECT & CERTIFY SUMMONS #35583847H & #35415008R. REMEDY:COMPLY W/EC CODE
#35634491X
Apr 7, 2022
IN VIOLATION
$0
Sep 16, 2021Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35447649N ISSUED ON 9/10/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMM
#35562525P
Apr 28, 2022
IN VIOLATION
$0
Jun 23, 2021Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35447649N ISSUE DON 9/10/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT.REME
#35561813P
Mar 31, 2022
IN VIOLATION
$0
Mar 31, 2021Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35447649N ISSUED ON 9/10/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT PERMIT.REM
#35528769M
Aug 26, 2021
IN VIOLATION
$0
Feb 4, 2021Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35447649N ISSUED ON 9/10/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NO PERMIT OR APPLICATIO
#35526880L
Aug 26, 2021
IN VIOLATION
$0
Dec 7, 2020Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35447649N ISSUED ON 9/10/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT PERMIT.REM:C
#35524515Y
Aug 26, 2021
IN VIOLATION
$0
Oct 20, 2020Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35447649N ISSUED ON 09-10-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. WORK WITHOUT A PERMIT C
#35521068H
Aug 26, 2021
IN VIOLATION
$0
Sep 11, 2020Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR DOB RECORD.NOTED:CO#20077 SHOWS ONE APARTMENT IN THE CELLAR EIGHT THE PENST FLOOR AND NINE APARTMENT ON EACH FLOOR FROM SECOND TO SIXTH-NO M
#35502979P
Nov 19, 2020
IN VIOLATION
$0
Aug 14, 2020Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35447649N ISSUED ON 09/10/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR
#35520352K
Oct 7, 2021
IN VIOLATION
$0
Jan 22, 2020Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35447649N ISSUED ON 09/10/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE
#35516361K
Aug 26, 2021
IN VIOLATION
$0
Sep 10, 2019Construction CLASS - 1
WORK WITHOUT A PERMIT.IN APT 5C I OBSERVED KITCHEN WITH GAS RANGE SINKAND DISWASHER RELOCATED CONTRARY TO WHAT WAS PLANNED IN JOB#140217805.NO PLUMNING OR ELECTRICAL PERMITS ON DEPT OF BUILDING RECORDS ON FILE
#35447649N
Aug 26, 2021
IN VIOLATION
$0
Sep 10, 2019Construction CLASS - 1
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.NOTE:REFER TO JOB#140317805 AND PLANS SUBMITTED WITH THAT JOB.PLAN STATE 5 BEDROOMS,HOWEVER AT THE TIME OF MY INSPECTION I OBS
#35447648L
Aug 26, 2021
IN VIOLATION
$0
Jul 16, 2019Construction CLASS - 1
OCCUPANCY CONTRARY TO CERTIFICATE OF OCCUPANCY OR DOB RECODS. AT TIME OF INSPECTION NOTED AT APT 1H CREATED DUPLEX APT WITH STAIRCASE CONNECTING 1ST FLOOR TO BASEMENT WITH FULL KITCHEN 3PC BATHROOM LIVING AND S
#35442228M
Mar 11, 2021
DEFAULT
$0
Jun 24, 2019Construction CLASS - 1
UNLAWFUL ACTS FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER IN MAY 15 2019 A ELECTRICAL VIOLATION WAS ISSUE TO THE RESPONDENT THE RESPONDNET FAILED TO COMPLWY WITH (NUC) ELECTRICAL CODE #27-3018(O)#354159
#35359930P
Mar 11, 2021
DEFAULT
$0
May 15, 2019Construction CLASS - 1
OCCUPANCY CONTRARY TO CERTIFICATE OF OCCUPANCY OR DEPT OF BUILDING RECORDS AT TIME OF INSPECTION NOTED:AT APT #1H CREATED DUPLEX DWELLING UNIT WITH STAIRCASE CONNECTING 1ST FLOOR TO BASEMENT CREATING ADDITIONAL
#35402345P
Sep 26, 2019
IN VIOLATION
$0
May 15, 2019Unknown CLASS - 1
ELECTRICAL WORK W/O A PERMIT. I OBSERVED AT APT 1H DUPLEX A NEW ELECTRICAL PANEL, DEVICES, AND LIGHT FIXTURES INSTALLED THROUGHOUT AND IN FULL USE W/O ANY ELECTRICAL PERMIT ON FILE AT THE DOB COVERING THIS
#35415008R
May 20, 2021
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
May 31, 2023HAZARDOUS CONDITION (FACADE)
CYCLE 9B UNSAFE REPORT FILED
#911153
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00014
DOB VIOLATION - ACTIVE
DOB NOW Safety (7)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
May 31, 2023Facades FISPHAZ
CYCLE 9B UNSAFE REPORT FILED
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
HPD (33) · C 3 · B 19 · A 11
IssuedClassViolationCorrect by
Sep 2, 2025BApt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTOct 7, 2025
Sep 2, 2025BApt 5F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTOct 7, 2025
Sep 2, 2025AApt 5F · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER AT NORTHEAST WALL IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTDec 6, 2025
Sep 2, 2025BApt 5F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE 1ST AND 2ND LOWER WALL CABINET DRAWER FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTOct 7, 2025
Sep 2, 2025BApt 5F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT CLOSET DOOR AT WEST WALL IN THE FOYER LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTOct 7, 2025
Sep 2, 2025BApt 5F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD WINDOW FRAME AT 1ST WINDOW FROM EAST AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTOct 7, 2025
Sep 2, 2025BApt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTOct 7, 2025
Sep 2, 2025BApt 5F · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT RISER [TOP] & [BOTTOM] IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTOct 7, 2025
Sep 2, 2025BApt 5F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTOct 7, 2025
Sep 2, 2025AApt 5F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, AND CEILINGS, BASEBOARD MOLDINGS, AND TRIMS INCLUDING INSIDE OF CLOSETS THROUGHTOUT IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTDec 6, 2025
Sep 2, 2025BApt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM NORTH AT EASTOct 7, 2025
May 28, 2025AApt 5F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MISSING CERAMIC WALL TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHAug 31, 2025
May 22, 2025CApt 5F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJun 17, 2025
May 22, 2025AApt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHAug 25, 2025
May 22, 2025BApt 5F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROTTED WOOD STOOL AT 1ST WINDOW FROM NORTH AT EAST IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJun 26, 2025
May 22, 2025BApt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL INSIDE THE CLOSET IN THE 1st ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJun 26, 2025
May 16, 2025BApt 5F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROTTED AND CHIPPED WOODED WINDOW STOOL AT EAST IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJun 20, 2025
May 16, 2025AApt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHAug 19, 2025
May 15, 2025AApt 5F · § 27-2005 HMC: REFIT CLOSET DOOR AT WEST IN THE PRIVATE HALLWAY LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHAug 18, 2025
May 15, 2025AApt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHAug 18, 2025
May 15, 2025AApt 5F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHAug 18, 2025
May 15, 2025CApt 5F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJun 10, 2025
May 15, 2025BApt 5F · § 27-2005 HMC: REFIT LOWER CABINET DRAWS AT SOUTH IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJun 19, 2025
May 15, 2025AApt 5F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHAug 18, 2025
May 15, 2025BApt 5F · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATHTUB IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJun 19, 2025
Oct 24, 2024B§ 67 M/D LAW POST A PRINTED SCALE FLOOR PLAN SHOWING MEANS OF EGRESS, AT MISSING ELEVATOR WAY AT PUBLIC HALL, 1st STORYNov 28, 2024
Jun 6, 2024CApt 5F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT 2ND WINDOW FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJun 12, 2024
Jun 6, 2024BApt 5F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH, 1ST WINDOW FROM WEST AT NORTH WALL . IN THE 1st ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJul 11, 2024
Jun 6, 2024BApt 5F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT EAST WALL IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJul 11, 2024
Jun 3, 2019A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CEILING PIERCED AT CELLAR SOUTH EAST WITH STAIRS INSTALLED TO APARTMENT 1H AT 1ST STORYSep 6, 2019
Jun 3, 2019B§ 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION PARTITIONS ERECTED FLOOR TO CEILING AT CELLAR SOUTH EAST IN CONJUNTION WITH APARTMENT 1H AT 1ST STORY CREATING DUPLEXJul 8, 2019
Jun 3, 2019B§ 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS BATHTUB, SHOWER, TWO WATER CLOSET AND TWO WASH BASINS AT CELLAR SOUTH EASTJul 8, 2019
May 9, 2019AApt 1H · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DUPLEX CREATED IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 12, 2019

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 10:52 PM ET. BBL 1018780037.

Look up another building