3 floors · 3 apartments · 2,664 sq ft · built 1931 · class C0 · owner of record: Sweeney, Kameke
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 49 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 49 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 65 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 293 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1145 days | Next cycle year 2029 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 28, 2026 | A | Apt 2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 1, 2026 |
| May 22, 2026 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 15, 2026 |
| May 15, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE BEARING WALL IN THE CELLAR | Jun 19, 2026 |
| May 15, 2026 | B | § 185, 240 M/D LAW PROPERLY FIRE RETARD IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT THE CELLAR CEILING THROUGHOUT WHERE NEEDED | Jun 19, 2026 |
| May 6, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 9, 2026 |
| Jun 11, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 14, 2025 |
| Apr 12, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 16, 2024 |
| Aug 10, 2023 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 5, 2023 |
| Aug 10, 2023 | B | Apt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT THE LOWER REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 14, 2023 |
| Aug 10, 2023 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 5, 2023 |
| Aug 10, 2023 | C | Apt 2R · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 16, 2023 |
| Mar 27, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 30, 2023 |
| Mar 2, 2022 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 5, 2022 |
| Apr 13, 2021 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 17, 2021 |
| Jun 27, 2019 | C | Apt 2 · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Jul 5, 2019 |
| Jun 13, 2019 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 18, 2019 |
| Jul 6, 2010 | B | Apt 2 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY | Aug 10, 2010 |
| Dec 5, 2003 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT BOILER ROOM DOOR AND AT PUBLIC HALL, 1st STORY | Dec 16, 2003 |
| Oct 22, 1996 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WINDOWS THRU OUT CELLAR | Dec 9, 1996 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 12, 2026, 12:25 AM ET. BBL 3038980011.