Queens · Block 5997 · Lot 42 · 11360

210-33 28th Avenue

class V0 · owner of record: Covey Sandler 3, Llc

6open violations
$11,875ECB/OATH penalties owed
0HPD class C (immediately hazardous)
—no dated deadlines found

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

We couldn't find building attributes for this lot, so no deadlines are listed.

Open violations

ECB / OATH (7) · $11,875 owed
IssuedViolationHearingBalance
Sep 22, 2026Construction CLASS - 2
NO EN DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS; CONTACT VIA EMAIL: ENERGYCODEINSPECTIONS@BUILDINGS.NYC.GOV
#39204995P
Dec 1, 2026
PENDING
$1,250
Sep 18, 2026Construction CLASS - 2
AT INSPECTION OF A 2-STORY BUILDING, A TEMPORARY PLATFORM AT EXP. 2, CONSTRUCTED OF OSHA PLANKS OVER AN EXCAVATION EXCEEDING 6 FEET DEEP, WAS OBSERVED. NO APPROVED DESIGN DRAWINGS WERE PROVIDED. THIS PRESENTS A
#39559323P
Nov 24, 2026
PENDING
$1,250
Sep 18, 2026Unknown CLASS - 2
3314.4.5 AT INSPECTION OF A 2-STORY BUILDING, ACTIVE WORK WAS OBSERVED. PIPE SCAFFOLDS AT EXP. 1 AND 4 HAD IMPROPERLY STORED BRICKS AND TOOLS. THIS CREATES AN IMMEDIATE COLLAPSE HAZARD TO WORKERS, PUBLIC, AND P
#39559325Z
Nov 24, 2026
PENDING
$2,500
Sep 18, 2026Construction CLASS - 2
2-STORY BUILDING, A TEMPORARY PLATFORM WAS OBSERVED AT THE 1ST-FLOOR LEVEL OVER THE CELLAR, WITH TEMPORARY STAIRS INSTALLED TO ACCESS THE 2ND FLOOR. NO APPROVED DESIGN DRAWINGS WERE PROVIDED UPON REQUEST. THIS
#39559333Z
Nov 24, 2026
PENDING
$1,250
Sep 18, 2026Unknown CLASS - 2
3314.1 AT INSPECTION OF A 2-STORY BUILDING, PIPE SCAFFOLDS AT EXP. 1 AND 4 HAD LOOSE PLANKING, MATERIALS/TOOLS, AND NO GUARDRAILS. CONDITIONS PRESENT AN IMMEDIATE HAZARD TO WORKERS, PUBLIC, AND PROPERTY. STOP A
#39559324R
Nov 24, 2026
PENDING
$2,500
Jul 18, 2026Construction CLASS - 2
OBSERVED AT LEAST THREE WORKERS ON THE JOBSITE. CONSTRUCTION FENCE DOORS WERE CHAIN-LOCKED FROM THE INSIDE. AFTER KNOCKING AND CALLING OUT LOUDLY SAYING "DEPARTMENT OF BUILDINGS", WORKERS WERE HIDING AND IGNORI
#39556789N
Mar 23, 2027
PENDING
$2,500
Jul 18, 2026Construction CLASS - 2
OBSERVED AT LEAST THREE WORKERS INSIDE THE JOBSITE. CONSTRUCTION FENCE DOORS WERE CHAIN-LOCKED FROM THE INSIDE. WORKERS WERE HIDING AND IGNORING ME WHEN SAYING DEPARTMENT OF BUILDINGS TO THEM. UPON RESEARCH THR
#39556786H
Sep 22, 2026
IN VIOLATION
$625
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 22, 2026ECBConstruction: NO EN DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS; CONTACT VIA EMAIL: ENERGYCODEINSPECTIONS@BUILDINGS.NYC.GOVOpen
Sep 18, 2026ECBConstruction: AT INSPECTION OF A 2-STORY BUILDING, A TEMPORARY PLATFORM AT EXP. 2, CONSTRUCTED OF OSHA PLANKS OVER AN EXCAVATION EXCEEDING 6 FEET DEEP, WAS OBSERVED. NO APPROVED DESIGN DRAWINGS WERE PROVIDED. THIS PRESENTS AOpen
Sep 18, 2026ECBUnknown: 3314.4.5 AT INSPECTION OF A 2-STORY BUILDING, ACTIVE WORK WAS OBSERVED. PIPE SCAFFOLDS AT EXP. 1 AND 4 HAD IMPROPERLY STORED BRICKS AND TOOLS. THIS CREATES AN IMMEDIATE COLLAPSE HAZARD TO WORKERS, PUBLIC, AND POpen
Sep 18, 2026ECBConstruction: 2-STORY BUILDING, A TEMPORARY PLATFORM WAS OBSERVED AT THE 1ST-FLOOR LEVEL OVER THE CELLAR, WITH TEMPORARY STAIRS INSTALLED TO ACCESS THE 2ND FLOOR. NO APPROVED DESIGN DRAWINGS WERE PROVIDED UPON REQUEST. THISOpen
Sep 18, 2026ECBUnknown: 3314.1 AT INSPECTION OF A 2-STORY BUILDING, PIPE SCAFFOLDS AT EXP. 1 AND 4 HAD LOOSE PLANKING, MATERIALS/TOOLS, AND NO GUARDRAILS. CONDITIONS PRESENT AN IMMEDIATE HAZARD TO WORKERS, PUBLIC, AND PROPERTY. STOP AOpen
Jul 18, 2026ECBConstruction: OBSERVED AT LEAST THREE WORKERS ON THE JOBSITE. CONSTRUCTION FENCE DOORS WERE CHAIN-LOCKED FROM THE INSIDE. AFTER KNOCKING AND CALLING OUT LOUDLY SAYING "DEPARTMENT OF BUILDINGS", WORKERS WERE HIDING AND IGNORIOpen
Jul 18, 2026ECBConstruction: OBSERVED AT LEAST THREE WORKERS INSIDE THE JOBSITE. CONSTRUCTION FENCE DOORS WERE CHAIN-LOCKED FROM THE INSIDE. WORKERS WERE HIDING AND IGNORING ME WHEN SAYING DEPARTMENT OF BUILDINGS TO THEM. UPON RESEARCH THRClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 10:54 PM ET. BBL 4059970042.

Look up another building