3 floors · 4 apartments · 4,837 sq ft · built 1910 · class S9 · owner of record: Greenwich-Tenth Company
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-05-08 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 22, 2018 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION. NOTE: AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED WITH THE FOLLOWING OBJECTIONS. -DAMAGED/MISSPLACED MUDSILLS. -EXPOSED BOLTS. -DAMAGED PARAPET PANEL J #35324052K | Oct 18, 2018 IN VIOLATION | $2,400 |
| Nov 3, 2017 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTE: AT TIMEOF INSPECTION OBSERVED SIDEWALK SHED IN PLACE W/SOME SECTION OF PARAPET DECKING LOOSE & ABOUT TO FALL & I ALSO OBSERVED MISSING CAPS ON BOLT #35285475N | Jan 31, 2019 IN VIOLATION | $2,400 |
| Issued | Violation | Status |
|---|---|---|
| Nov 4, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT THE T IME OF INSPECTION,I OBSERVED AT EXP1 VERTICAL CRACK ALONG THE BRICK MA SONRY AT THE ENTRANCE OF THE BUILDING.AT EXP3 DAMAGED/MISSING ROOF COR NICE AND AT EXP4 CRACK ON BRICK AND DAMAGED DOOR FRAME OBSERVED.REMEDY :REPAIR AND/OR R #SR10202JR | DOB VIOLATION - ACTIVE |
| Jul 23, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED @ EXP1 VERTICAL CRACK ALONG THE BRICK MASONRY AT THE ENTRANCE OF THE BUILDING. EXP3 DAMAGED/MISSING ROOF CORNICE @ AT EXP4 CRACK ON BRICK AND FLAKING OF PAINT OBSERVED. REMEDY: REPAIR AND/OR REPLACE #SR10201JR | DOB VIOLATION - ACTIVE |
| Apr 27, 2026 | LANDMARK #26-0686 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #02349 | DOB VIOLATION - ACTIVE |
| Jul 16, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. EXPOSURE 1 ON THE 1ST FL. MISSING BRICKS CRACK MASONRY AND MOVEMENT OF WALL SHOWN EXPOSURE 4 DAMAGED AT LINTELS BROWN STONE AND FLAKING OF PAINT AT CORNER OF EXPOSURE 1 AND 4. REMEDY: MAINTAIN BUILDING. REPAIR AND/OR REPLACE #SR0201NS | DOB VIOLATION - ACTIVE |
| Jul 8, 2015 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONERS ORDER (VIO#051115FEU10201JH) YOU WERE SERVED WITH A COMMISSIONERS ORDER DATED5/11/15 REQUIRING YOU TO HAVE A LICENSED PROFFESSIONAL TO FILE REPAIR DRAWINGS WITH THE DOB & BEGIN WORK BY6/10/15. THIS WORK WAS NOT DONE #FEU10201JH | DOB VIOLATION - ACTIVE |
| May 11, 2015 | CONSTRUCTION FAILURE TO MAINTAIN.3STORY+CELLAR MIXED USE WOOD FRAMED W/MASORY BEARING WALLS,LANDMARKED BLDG ON CORNER LOT.DIAGONAL STEP CRACKING AT EXP1 MASONRY WALL AT SEVERAL LOCATIONS.SLIGHT BULGING AT EXP4 EXTERIOR MASONRY BEARING WALL.OWNER TO ENGAGE LICENSED PROFESSIONAL TO PREPARE REPAIR DWG TOBE FILED WI #FEU10201JH | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Nov 4, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT THE T IME OF INSPECTION,I OBSERVED AT EXP1 VERTICAL CRACK ALONG THE BRICK MA SONRY AT THE ENTRANCE OF THE BUILDING.AT EXP3 DAMAGED/MISSING ROOF COR NICE AND AT EXP4 CRACK ON BRICK AND DAMAGED DOOR FRAME OBSERVED.REMEDY :REPAIR AND/OR R | Open |
| Jul 23, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED @ EXP1 VERTICAL CRACK ALONG THE BRICK MASONRY AT THE ENTRANCE OF THE BUILDING. EXP3 DAMAGED/MISSING ROOF CORNICE @ AT EXP4 CRACK ON BRICK AND FLAKING OF PAINT OBSERVED. REMEDY: REPAIR AND/OR REPLACE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 9:37 PM ET. BBL 1006100053.