Brooklyn · Block 3456 · Lot 48 · 11207

21 Granite Street

3 floors · 6 apartments · 4,725 sq ft · built 1911 · class C2 · owner of record: Spf Realty Associates Llc

37open violations
$1,250ECB/OATH penalties owed
2HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 67 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2017-08-28 (Accepted). Agency page

Dec 31, 2026
in 67 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual

Open violations

ECB / OATH (2) · $1,250 owed
IssuedViolationHearingBalance
Nov 29, 2021Construction CLASS - 1
WORK W/O PERMIT.UPON INSPECTION OBSERVED ILLEGAL WOODEN BUILDING (PLYWOOD AND STUDES)IN REAR YARD EXP #3 APROX 10'W X 10'L X 8'H HAS TWO KEY LOCKED DOORS AND 5 WINDOWS (FRAME/GLASS) CELING IS CORRUGATED METAL W
#35578626K
Jun 29, 2022
IN VIOLATION
$1,250
May 22, 2003Construction Non-Hazardous
FAILURE TO MAINTAIN EXTERIOR WALL:DEFECT IS:CEMENT STUCCO IS CRACKED AND BROKEN AND MISSING ON EXTERIOR FACADE WALL ADJACENT 23 GRANITE ST VACANT LOT OF FRONT ENTRY IS CRACKED AND DEFECTIVE BY EXTERIOR STEPS
#34390483L
Jul 7, 2003
IN VIOLATION
$0
DOB (10)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#11638
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#10582
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#05163
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#24912
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#26670
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#05180
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#11724
DOB VIOLATION - ACTIVE
Mar 2, 2022FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00319
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#11469
DOB VIOLATION - ACTIVE
Jul 25, 1994LOCAL LAW 62/91 - BOILERS

#01651
DOB VIOLATION - ACTIVE
DOB NOW Safety (11)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 4)
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Mar 2, 2022AEUHAZ FTC-AEU-HAZ
Active
Jan 6, 2006Boiler LL6291
Active
Jul 25, 1994Boiler LL6291
Active
HPD (14) · C 2 · B 8 · A 4
IssuedClassViolationCorrect by
Nov 14, 2024BApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHDec 19, 2024
Nov 14, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT STUCCO AT EAST SIDE OF BUILDING YARD, 3rd STORYDec 19, 2024
Jun 10, 2022B§ 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, GAS RANGE INSTALLED AT EAST WALL IN THE CELLAR REARJul 15, 2022
Jun 10, 2022A§ 27-2005 ADM CODE REFIT BOILER ROOM DOOR IN THE CELLARSep 13, 2022
Feb 21, 2017BApt 1R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMar 28, 2017
Feb 21, 2017BApt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMar 28, 2017
Feb 21, 2017CApt 1R · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE UPPER AND LOWER SASHES OF WINDOW IN THE 5th ROOM FROM EAST LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMar 1, 2017
Feb 21, 2017CApt 1R · § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LOCKABLE SLIDE BOLT ON APT. DOOR IN THE ENTRANCE LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMar 1, 2017
Feb 21, 2017AApt 1R · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AROUND STEAM RISER AT CEILING AND FLOOR IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMay 27, 2017
Dec 11, 2015BApt 1R · SECTION 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTELINE SINK IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJan 15, 2016
Dec 11, 2015AApt 1R · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EASTMar 15, 2016
Dec 11, 2015BApt 1R · SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJan 15, 2016
Dec 11, 2015BApt 1R · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJan 15, 2016
Dec 11, 2015AApt 1R · SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL , IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EASTMar 15, 2016

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 11:23 AM ET. BBL 3034560048.

Look up another building