5 floors · 108,500 sq ft · built 1925 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-18 (Accepted). Agency page | Dec 31, 2026 in 69 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 108,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 880). Agency page | Dec 31, 2030 in 1530 days | Next due 2030 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 12, 2026 | Construction CLASS - 2 FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION OBSERVED PARAPET WALL MISSING AROUNDENTIRE SIDEWALK SHED AT EXPOSURE #3(PLAYGROUND) CAUSING DANGEROUS HAZA #35721718R | Oct 20, 2026 | $5,000 |
| Aug 12, 2026 | Unknown CLASS - 2 MISCELLANEOUS CHAPTER 33 VIOLATIONS. AT TIME OF INSPECTION, OBSERVED ALOOSE NETTING AT MULTIPLE LOCATIONS AT EXPOSURE #2 MAKING A SAFETY HAZARD TO PUBLIC BY POTENTIALLY FLYING DEBRIS. REMEDY: COMPLY WITH CODE. #35721717P | Oct 20, 2026 | $2,500 |
| Feb 4, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIORSMOKE DOORS DO NOT SELF-CLOSE PROPERLY. 5TH FLR-"STAIRCASE B", "STAIRCASE C". 4TH FLOOR-"STAIRCASE C", "STAIRCASE D". 2ND FLR-"STAIRCASE B", #35728609J | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 4, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: AT THE TIME OF INSPECTION OBSERVED FIRESTOPPING MISSING IN VARIOUS PLACES AROUND ELECTRIC METER ROOM. REMEDY: #35728612K | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 4, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATIONS FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: EMERGENCY LIGHTS DO NOT WORK WHEN TESTED, 1ST FLR-#1, #2. 5TH F #35728610R | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 4, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: ON THE 1ST FLOOR EXIT 6 AND EXIT 7 EXTERIOR DOORS NOT SELF-CLOSE PROPERLY. REMEDY: REPAIR/REPLACE DOOR. #35728611Z | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 29, 2024 | Construction CLASS - 2 REISSUE#35671726Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ROOF LEVEL BULKHEAD HAVE CRACKS AND SPALLING.RUSTED REBARS EXPOSED.REM:REPAIR AND/OR REPLACE. #35678689X | May 6, 2024 POP/IN-VIO | $0 |
| Feb 14, 2023 | Construction CLASS - 2 REISSUE:35636497X-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ROOF LEVEL BULKHEADS ALL OF THEM CRACKS AND SPALLING,RUSTED REBARS EXPOSED.REM:COMPLY WITH CODE. #35671726Y | May 30, 2023 POP/IN-VIO | $0 |
| Mar 16, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER NOTED:@ROOF LEVEL BULKHEAD4&5 CRACKS IN WALL&@BULKHEAD2&3 WALL&CEILING IN STATE OF DISREPAIR W/SPALLING CONCRETE/PLASTER EXPOSED RUSTED REBARD DUE TO WATER PENET #35636497X | Jun 28, 2022 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 17, 2001 | CONSTRUCTION #0101N | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Aug 12, 2026 | ECB | Construction: FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION OBSERVED PARAPET WALL MISSING AROUNDENTIRE SIDEWALK SHED AT EXPOSURE #3(PLAYGROUND) CAUSING DANGEROUS HAZA | Closed |
| Aug 12, 2026 | ECB | Unknown: MISCELLANEOUS CHAPTER 33 VIOLATIONS. AT TIME OF INSPECTION, OBSERVED ALOOSE NETTING AT MULTIPLE LOCATIONS AT EXPOSURE #2 MAKING A SAFETY HAZARD TO PUBLIC BY POTENTIALLY FLYING DEBRIS. REMEDY: COMPLY WITH CODE. | Closed |