5 floors · 48 apartments · 36,633 sq ft · built 1920 · class C7 · owner of record: 2095 Gc Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 36,633 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 21, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTROL #347929 VIO #100125PI20503HZ DATED 10/01/25. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTIONPLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S ORDER. #35718983K | Feb 6, 2026 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 1, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#341487 VIO#PI20501SB DATED 07/09/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/08/25 AND START BLDG REPAIRS UNDER PERMIT BY 09/08/25 & COMPL SIGN OF BY 10/8/25 AS OF 10/1/25 THE CAP & EVIDENE OF COMPL RPR WORK WAS NOT REC'D.IMMED CONPLY W/COMMISSIONE #PI20503HZ | DOB VIOLATION - ACTIVE |
| Jul 9, 2025 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-@ EXP1 OBSVD DAMAGED/DETERIORATED WINDOW LINTELS & DETERIORATED MORTAR JOINTS IN COURTYARD AREA. @ EXP2/3/4 SPALLING/CRACKED MASONRY @ MULT LOCATIONS & CRACKED WINDOWS. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN TO PRO #PI20501SB | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2002262 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 19, 2026 | C | Apt 30 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 14, 2026 |
| Oct 19, 2026 | B | Apt 30 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE TILES AT NORTH WALL OVER THE BATHTUB IN THE BATHROOM LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 23, 2026 |
| Oct 19, 2026 | B | Apt 30 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING (BESIDE THE WINDOW) IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 23, 2026 |
| Oct 19, 2026 | C | Apt 30 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 14, 2026 |
| Oct 19, 2026 | B | Apt 30 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10SQ.FT BUT LESS THAN 30 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 23, 2026 |
| Oct 1, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED FLOOR AT PUBLIC HALL AT NORTH , 2nd STORY, SECTION ''NORTH'' | Nov 5, 2026 |
| Sep 3, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT REAR YARD. | Oct 8, 2025 |
| Jan 31, 2024 | B | Apt 40 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 7 SQ FT AT EAST WALL APPROX 3 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 40, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 6, 2024 |
| Sep 1, 2023 | C | Apt 24 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 24, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 27, 2023 |
| Apr 26, 2022 | B | Apt 11 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 11, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'', 1st | May 31, 2022 |
| Apr 26, 2022 | B | Apt 2 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'', 1st | May 31, 2022 |
| Apr 26, 2022 | B | Apt B1 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT BSMT-APT B1, 1st BSMT-APT FROM WEST AT NORTH | May 31, 2022 |
| Apr 26, 2022 | B | Apt 18 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 18, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'', 1st | May 31, 2022 |
| Apr 18, 2022 | B | Apt 35 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 35, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | May 23, 2022 |
| Apr 18, 2022 | B | Apt 14 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 14, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 23, 2022 |
| Apr 18, 2022 | B | Apt 19 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 19, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 23, 2022 |
| Apr 18, 2022 | B | Apt 33 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 33, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 23, 2022 |
| Apr 18, 2022 | B | Apt 41 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 41, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | May 23, 2022 |
| Apr 14, 2022 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Apr 18, 2022 |
| Apr 14, 2022 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Apr 18, 2022 |
| Jun 3, 2021 | C | Apt 43 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 43, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Jun 29, 2021 |
| Jun 3, 2021 | C | Apt 43 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 43, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Jun 29, 2021 |
| Jun 16, 2020 | C | Apt B2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT B2, 1st BSMT-APT FROM SOUTH AT WEST , SECTION ''NORTH'' | Jul 12, 2020 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 19, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE TILES AT NORTH WALL OVER THE BATHTUB IN THE BATHROOM LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 19, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING (BESIDE THE WINDOW) IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 19, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 19, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10SQ.FT BUT LESS THAN 30 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 30, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 1, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED FLOOR AT PUBLIC HALL AT NORTH , 2nd STORY, SECTION ''NORTH'' | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 1:50 PM ET. BBL 2031610026.