6 floors · 42 apartments · 53,400 sq ft · built 1939 · class D1 · owner of record: Emerald 2095 Cruger Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 49 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 49 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 65 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 53,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 170 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 170 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 293 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 414 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4287). Agency page | Dec 31, 2027 in 414 days | Next due 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 21, 2025 | Construction CLASS - 1 FAILURE TO TAKE REQUIRED MEASURE TO SECURE PUBLIC SAFETY-UNSAFE FACADEFILED BY QEWI#UNSAFE-1019482-10B-001.AT TIME OF INSPECTION,I OBSERVED CRACKING/LOOSE MASONRY BRICKS OF SPANDREL WALL.BROKEN WINDOWSIL,STEP C #35718450H | Oct 6, 2026 IN VIOLATION | $10,000 |
| Jun 25, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING FACADE AND/OR APPURTENANCES IN CODE-COMPLIANT MANNER: AT TIME OF INSPECTION IT WAS OBSERVED VERTICAL 4 STEP CRACKS WERE OBSERVED AT EXPOSURES 1, 2, 3, 4(EAST, SOUTH, WEST AND NORTH #35694030H | Oct 30, 2026 DEFAULT | $25,000 |
| Dec 17, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING EXTERIOR WALL FACADE AND APPURTENANCES. AT THE TIME OF INSPECTIONS OBSERVED DEFECTED CONDITIONS AT ALL EXPOSURES AND ROOF AREA. CRACKS, DAMAGED JOINTS, DEFLATED WINDOW LINTEL AND DA #35689477H | Aug 22, 2025 IN VIOLATION | $0 |
| Oct 31, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED (1)CRACKED BRICK/MORTAR JOINTS MULTILOC. AT EXP #1 EAST, #2 SOUTH, #3 WEST. (2)CRACKED WINDOW GLASS EXP #3 #35686871M | Jul 11, 2025 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 1, 2026 | B | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT UPPER WINDOW SASH AT 1ST WINDOW FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 5, 2026 |
| Jul 1, 2026 | C | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH AT FIRE ESCAPE WINDOW IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 7, 2026 |
| Jul 1, 2026 | B | Apt 3D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILE IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 5, 2026 |
| Jan 21, 2026 | B | Apt 3B · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 25, 2026 |
| Jan 21, 2026 | B | Apt 3B · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 25, 2026 |
| Apr 26, 2024 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 30, 2024 |
| Apr 2, 2024 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 7, 2024 |
| Sep 18, 2023 | C | Apt 3D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10SQ. FT AT NORTH WALL AND 10 SQ FT. AT EAST WALL. IN THE 1st ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16012849 ISSUED 31-MAY-23 HAS BEEN UPGRADED TO CL | Oct 14, 2023 |
| Jun 2, 2023 | C | Apt 3D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 15 SQ FT. AT CEILING AND 15 SQ. FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Jun 28, 2023 |
| Jun 7, 2022 | C | Apt 3D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE FOYER LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Jul 1, 2022 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 12, 2026, 8:39 PM ET. BBL 2042870055.