6 floors · 29 apartments · 26,712 sq ft · built 1920 · class C1 · owner of record: 2094 Creston Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-21 (Accepted). Agency page | Dec 31, 2026 in 60 days | 1 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 26,712 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 13, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER#100125PI120501HZ CONTROL#347927 DATED 10/01/25.NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN.REM:COMPLY WITH THE COMMISSIONERS ORDER. #35718979H | Feb 11, 2027 PENDING | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Oct 1, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#341486 VIO#PI20502SB DATED 07/08/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/08/25 AND START BLDG REPAIRS UNDER PERMIT BY 09/08/25&COMPL SIGN OFF BY 10/8/25 AS OF 10/1/25 THE CAP&EVIDENCE OF COMPL REPR WORK WAS NOT REC'D. IMMED COMPLY W/COMMISSIONE #PI20501HZ | DOB VIOLATION - ACTIVE |
| Jul 8, 2025 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D. OBSVD HAZ COND@EXP2/3/4 SUCH AS SPALLING /CRACKED MASONRY SPALLING WINDOW SILLS & DETERIORATED MORTAR JOINTS @ MULT LOCATIONS. @EXP4 COURTYARD OBSVD A CRACK GLASS WINDOW ON 3FL OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & SUBMIT CORRECTIVE ACTION PLAN TO #PI20502SB | DOB VIOLATION - ACTIVE |
| Aug 2, 2024 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00279 | DOB VIOLATION - ACTIVE |
| May 2, 2024 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00549 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 28, 2025 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Dec 2, 2024 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Aug 2, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 12, 2026 | C | Apt 2D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 7, 2026 |
| Aug 12, 2026 | B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE THE OBSTRUCTION IN FIREPROOF PASSAGEWAY TRASH CANS AND CONSTRUCTIOM MATERIALS AT FIRE PASSAGE WAY AT NORTH | Sep 16, 2026 |
| Aug 12, 2026 | A | Apt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILE IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 15, 2026 |
| Jun 16, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE FLASHING AT ALL STORIES AT NORTH EXTERIOR WALL AT PUBLIC HALL | Jul 21, 2025 |
| May 4, 2022 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT 2ND WINDOW FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 8, 2022 |
| May 4, 2022 | B | Apt 4C · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE UPPER SASH GLASS PANE AT WINDOW AT WEST WALL IN THE KITCHEN LOCATED AT APT 4C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 8, 2022 |
| May 4, 2022 | A | Apt 3C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 7, 2022 |
| May 4, 2022 | B | Apt B-5 · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN , EVIDENCE OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT B-5, 2nd STORY | Jun 8, 2022 |
| May 4, 2022 | C | Apt 4C · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 2; IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 3rd STORY, 1st APA | May 10, 2022 |
| May 4, 2022 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC GFI OUTLET AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 8, 2022 |
| May 4, 2022 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT 2ND WINDOW FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 4C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 8, 2022 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 12, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Aug 12, 2026 | HPD B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE THE OBSTRUCTION IN FIREPROOF PASSAGEWAY TRASH CANS AND CONSTRUCTIOM MATERIALS AT FIRE PASSAGE WAY AT NORTH | Open |
| Aug 12, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILE IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)