6 floors · 97,500 sq ft · built 1990 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 97,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3178). Agency page | Dec 31, 2028 in 795 days | Next due 2028 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 31, 2026 | Construction CLASS - 2 RE-ISSUE #35725280J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT BASEMENT LEVEL INSIDE MACHINE ROOM, ELECTRIC METER ROOM THERE ARE VARIOUS POROUS AREAS ALLOWING WATER TO PENETRATE INTO ROOM #35734642M | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 31, 2026 | Construction CLASS - 2 RE-ISSUE #35725281L. FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: AT EXP #3(MORRIS AVE) COLUMNS ON RETAINING WALL ARE IN DISREPAIR WITH CRACKED MASONRY BRICKS. REMEDY: MAINTAIN EXTERIOR BUILDIN #35734641K | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 31, 2026 | Construction CLASS - 2 RE-ISSUE #35725284R. EXIT DOOR NOT SELF-CLOSING. NOTED: ON ROOF LEVEL EXIT "1" EXIT DOES NOT SELF-CLOSE PROPERLY(DOOR CLOSER BROKEN). 1ST FLR-EXTERIOR EXIT "3" DOES NOT SELF-CLOSE PROPERLY WHEN TESTED(RIGHT DOO #35734639L | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 31, 2026 | Construction CLASS - 2 RE-ISSUE #35725282N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIOR FPSC DOORS DO NOT SELF-CLOSE PROPERLY WHEN TESTED AT 4TH FLR-BOYS AND GIRLS BATHROOMS. BASEMENT-EXIT "3"(INTERIOR). CL #35734640Z | Aug 21, 2026 POP/IN-VIO | $0 |
| Sep 5, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED INTERIOR DOORS DO NOT SELF CLOSE PROPERLY.5TH FLR-SMOKE DOOR NEAR 511,4TH FLR-STAIR B.3RD FLR-STAIR A,STAIR B & STAIR C.2ND FLR STAIR C.1ST F #35725282N | Oct 10, 2025 POP/IN-VIO | $0 |
| Sep 5, 2025 | Construction CLASS - 2 REISSUE#35684848P FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESAT TIME OF INSPECTION I OBSERVED AT EXPOSURE#3 AT REAR OF SCHOOL PLAYGROUND HAS SEVERAL MASONRY COLUMNS AND RETAINING WALLS THAT ARE IN STAT #35725281L | Oct 10, 2025 POP/IN-VIO | $0 |
| Sep 5, 2025 | Construction CLASS - 2 REISSUE#35684849R FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:AT TIME OF INSPECTION I OBSEVED AT BASEMENT LEVEL,AT ELEVATOR MACHINE ROOM,ELECTRICAL ROOM,AND BOILER ROOM WORK LINE VARIOUS POUROUS AREAS #35725280J | Oct 10, 2025 POP/IN-VIO | $0 |
| Sep 5, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.NOTED:EXTERIOR DOORS DO NOT SELF-CLOSE PROPERLY WHEN TESTED.ROOF STAIR A 2ND FLR EXIT 2.1ST FLR-EXIT 3,EXIT 4.REMREPAIR AND/OR REPLACE DOOR. #35725284R | Oct 10, 2025 POP/IN-VIO | $0 |
| Sep 20, 2024 | Construction CLASS - 2 REISSUE#35655122N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF MY INSPECTION I OBSERVED AT THE BASEMENT LEVEL AT ELEVATOR MACHINE ROOM AND ELECTRICAL ROOM AND BOILER ROOM WALK LINE VARIOUS P #35684849R | Nov 29, 2024 POP/IN-VIO | $0 |
| Sep 20, 2024 | Construction CLASS - 2 REISSUE#35676210X FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESAT TIME OF MY INSPECTION I OBSERVED AT EXPOSURE#3 AT THE REAR SCHOOL PLAYGROUND HAS SEVERAL MASONRY COLUMNS AND RETAINING WALLS THAT ARE IN #35684848P | Nov 29, 2024 POP/IN-VIO | $0 |
| Jun 14, 2023 | Construction CLASS - 2 RE-ISSUED #35654900X-FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTE: OBSERVED AT EXP.3/REAR, SCHOOL PLAYGROUND HAS SEVERAL MASONRY COLUMNS & RETAINING WALLS THAT ARE IN STATE OF DISREPAIR WITH STEP #35676210X | Oct 20, 2023 POP/IN-VIO | $0 |
| May 13, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTED:OBSERVED@EXP1/FRONT,SCHOOL PLAYGRND HAS SEVERAL MASONRY COLUMNS IN DISREPAIR W/NUMEROUS SPALLING BRICKS&CRACKS THRUOUT.REPAIR &OR REPLACE,COLUMNS (MASONRY) #35654900X | Sep 2, 2022 POP/IN-VIO | $0 |
| May 13, 2022 | Construction CLASS - 2 REISSUE35560761H FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTED:OBSERVED@BSMT ELEVATOR MACHINE RM,ELECTRICAL METER RM&IN BOILER RM.WALLS HAVE VARIOUS POUROUS AREAS WHICH HAVE WATER PENETRATING INTO RMS #35655122N | Sep 2, 2022 POP/IN-VIO | $0 |
| Jan 10, 2022 | Boilers CLASS - 2 CONTROL COVER MISSING-DEFECT. ELECT. AT BURNER, GAS TRAIN-LUGZ/DAWGS MISSING 01 AND 02 BLRS-MAKEUP TANK OVERFLOW PIPE STEAMING ON GAS TRAIN AND BOILER-CORRODED PIPING ON GAS TRAIN AND LOW WATER CUTOFF BLOW DOWN #39054190R | Jan 12, 2022 POP/IN-VIO | $0 |
| May 5, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTE@BSMT LEVEL IN ELEVATOR MACHINE RM,IN BOILER RM&@ ELECTRICAL RM,WATER PENETRATING WALLSIN VARIOUS PLACES,ACCUMULATING ON FL CREATING STANDING PUDDLES OF WATE #35560759Z | Sep 17, 2021 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07890 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07891 | DOB VIOLATION - ACTIVE |
| Oct 1, 2019 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00463 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02158 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Apr 23, 2025 | Retaining Walls | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Oct 1, 2019 | Retaining Walls FTF-RW-INITL | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 31, 2026 | ECB | Construction: RE-ISSUE #35725280J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT BASEMENT LEVEL INSIDE MACHINE ROOM, ELECTRIC METER ROOM THERE ARE VARIOUS POROUS AREAS ALLOWING WATER TO PENETRATE INTO ROOM | Open |
| Jul 31, 2026 | ECB | Construction: RE-ISSUE #35725281L. FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: AT EXP #3(MORRIS AVE) COLUMNS ON RETAINING WALL ARE IN DISREPAIR WITH CRACKED MASONRY BRICKS. REMEDY: MAINTAIN EXTERIOR BUILDIN | Open |
| Jul 31, 2026 | ECB | Construction: RE-ISSUE #35725284R. EXIT DOOR NOT SELF-CLOSING. NOTED: ON ROOF LEVEL EXIT "1" EXIT DOES NOT SELF-CLOSE PROPERLY(DOOR CLOSER BROKEN). 1ST FLR-EXTERIOR EXIT "3" DOES NOT SELF-CLOSE PROPERLY WHEN TESTED(RIGHT DOO | Open |
| Jul 31, 2026 | ECB | Construction: RE-ISSUE #35725282N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIOR FPSC DOORS DO NOT SELF-CLOSE PROPERLY WHEN TESTED AT 4TH FLR-BOYS AND GIRLS BATHROOMS. BASEMENT-EXIT "3"(INTERIOR). CL | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 7:23 PM ET. BBL 2031780014.