21 floors · 1037 apartments · 960,850 sq ft · built 1983 · class R4 · owner of record: The Bay Club Condo
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual boiler inspection (9 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-27 (Accepted). Agency page | Dec 31, 2026 in 61 days | 2 of 9 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 960,850 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $381,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 844 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5893). Agency page | Dec 31, 2033 in 2618 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 26, 2025 | Construction CLASS - 1 UNLAWFULLY CONTINUED TO WORK WHILE ON NOTICE OF A STOP WORK ORDER. PSWO ISSUED ON 4/22/2021, FOR CHASE WALL & GAS PIPING INSTALLATION AT STAIRWELL B (WORK WAS 70% COMPLETE). AT TIME OF INSPECTION, OBSERVED ALL #39155402M | Apr 7, 2026 IN VIOLATION | $0 |
| Apr 22, 2021 | Construction CLASS - 2 CONSTRUCTED CHASE WALL FOR 5" GAS PIPING THROUGH THE STAIRWELL B AT 1ST AND 2ND FLOOR AT TIME OF INSPECTION. 70 % WORK COMPLETED. OBSERVED METAL STUD FRAMING AND GYPSUM BOARD COVERING FOR THE GAS LINE. NO PERMI #39039933N | Jun 8, 2021 ADMIT/IN-VIO | $0 |
| Jun 29, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35365798H ISSUED ON 11/12/2019,& TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 & 1 RCNY 102-01(D)(2).REMEDY:FILE A CERTIFICATE #37019636X | Jan 26, 2021 IN VIOLATION | $1,250 |
| May 5, 2008 | Unknown Non-Hazardous 1)FAILED TO NOTIFY THE DOB PRIOR TO THE USE OR INSTALLATION OF OUTRIGGER BEAMS IN CONNECTION WITH SCAFFOLDS. 2) APPROVED PLAN NOT AVAILABLE FOR INSPECTION. 3) LICENSED RIGGER FAILED TO ENSURE THAT THE SCAFFOLD #34635490M | Aug 11, 2009 IN VIOLATION | $0 |
| May 5, 2008 | Cranes and Derricks Non-Hazardous USING HOISTING EQUIPMENT IN AN UNSAFE MANNER: OBSERVED 1)USING 2 "J" BOLTS ON 5/16 WIRE ROPE, REQUIRED MIN 3 FOR THE BACKS 2) USING 650LB OF COUNTER WEIGHTS ON + 2.5FT OVER HANG AND 12FT SPAN FROM(FULCRUM)TO CO #34635491Y | Aug 11, 2009 IN VIOLATION | $0 |
| May 5, 2008 | Unknown Non-Hazardous FAILURE TO NOTIFY THE DOB PRIOR TO THE USE OR INSTALLATION OF OUT RIGGER BEAMS IN CONNECTION WITH SCAFFOLDS. 2) CD-5 AND APPROVED (DEAN) NOT AVAILABLE FOR INSPECTION. #34635492X | Aug 11, 2009 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20470 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #25603 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20476 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20475 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20474 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20473 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20472 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20471 | DOB VIOLATION - ACTIVE |
| Dec 1, 2022 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2201864 | DOB VIOLATION - ACTIVE |
| Dec 17, 2021 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00899 | DOB VIOLATION - ACTIVE |
| Dec 17, 2021 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00898 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2103499 | DOB VIOLATION - ACTIVE |
| Jul 30, 2019 | FACADE SAFETY PROGRAM #HAZ78308 | DOB VIOLATION - ACTIVE |
| Jan 10, 2009 | CONSTRUCTION #ER01JM | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #29470 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #29469 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #29467 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #29468 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #29472 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #29471 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #45694 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #45693 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Dec 1, 2022 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Dec 17, 2021 | Elevators EVCAT5 | Active |
| Dec 17, 2021 | Elevators EVCAT5 | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACJ1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACJ1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
Showing 60 of 73. Full list on the agency site.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 2, 2026 | B | Apt 19C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 19C, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-F'' ORIGINAL VIOLATION 18978822 ISSUED 03-JUN-26 HAS BEEN UPGRADED TO | Nov 6, 2026 |
| Jun 4, 2026 | B | Apt 19C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 19C, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-F'' | Jul 9, 2026 |
| Apr 21, 2026 | B | Apt 19C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING AT N1 BATHROOM IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 19C, 19th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''A-Y'', AT WEST ORIGINAL VIOLATION 18520040 ISSUED 21 | May 26, 2026 |
| Dec 22, 2025 | C | Apt 19C · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 7, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 19C, 19th STORY, 3rd AP | Jan 17, 2026 |
| Dec 22, 2025 | B | Apt 19C · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 19C, 19th STORY, 3rd APARTMENT FROM WEST AT NORTH , | Jan 26, 2026 |
| Dec 22, 2025 | B | Apt 19C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT WEST 2 WINDOW IN THE 2nd ROOM FROM NORTH LOCATED AT APT 19C, 19th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''A-Y'', AT WEST | Jan 26, 2026 |
| Dec 22, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT LAUNDRY ROOM DOOR AT PUBLIC HALL, 19th STORY, SECTION ''A-Y'', AT WEST | Jan 5, 2026 |
| Dec 22, 2025 | B | Apt 19C · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 19C, 19th STORY, 3rd APARTMENT FROM WEST AT NORTH , S | Jan 26, 2026 |
| Dec 30, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT COMPACTOR CLOSET, 12th STORY, SECTION ''A-H'' | Jan 13, 2025 |
| Dec 30, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT LAUNDRY ROOM, 1st STORY | Jan 13, 2025 |
| Dec 19, 2024 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM NEAR MAILBOX AT PUBLIC HALL, 1st STORY | Dec 25, 2024 |
| Sep 11, 2023 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Dec 15, 2023 |
| Sep 11, 2023 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL | Dec 15, 2023 |
| Sep 11, 2023 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX .. AT PUBLIC HALL, 1st STORY | Dec 15, 2023 |
| Sep 11, 2023 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Dec 15, 2023 |
| Sep 11, 2023 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Dec 15, 2023 |
| Sep 11, 2023 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR .. AT PUBLIC HALL, 1st STORY | Dec 15, 2023 |
| Sep 11, 2023 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY | Sep 17, 2023 |
| Sep 11, 2023 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | Dec 15, 2023 |
| Aug 30, 2021 | B | Apt 3K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL AT PRIVATE HALL CLOSET ( 4 SQ FT) LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 14314262 ISSUED 28-APR-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-20 | Oct 4, 2021 |
| Apr 30, 2021 | B | Apt 3K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 4, 2021 |
| Nov 22, 2019 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Feb 25, 2020 |
| Nov 22, 2019 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX .... AT PUBLIC HALL, 1st STORY | Feb 25, 2020 |
| Nov 22, 2019 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Feb 25, 2020 |
| Nov 22, 2019 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY | Feb 25, 2020 |
| Nov 22, 2019 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Feb 25, 2020 |
| Nov 22, 2019 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR ... AT PUBLIC HALL, 1st STORY | Feb 25, 2020 |
| Aug 8, 2019 | B | Apt 5G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 12, 2019 |
| Aug 8, 2019 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 12, 2019 |
| Dec 12, 2012 | A | Apt 4P · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS THRUOUT 4 STY APT 4P. , SECTION '' '' | Mar 17, 2013 |
| Dec 12, 2012 | C | Apt 20D · § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK ON THE ENTRANCE DOOR TO THE APT. IN THE ENTRANCE LOCATED AT APT 20D, 20th STORY, APARTMENT AT EAST | Dec 18, 2012 |
| Dec 12, 2012 | C | Apt 9P · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF OFFENSIVE ODORS AT WEST WALL OF APT 9P FROM APT 9O WEST SECTION. , SECTION '' '' | Dec 18, 2012 |
| Dec 12, 2012 | A | § 27-2005 ADM CODE REFIT WINDOWS MAKE OPENABLE 9 STY REAR APT 9M THRUOUT APT. | Mar 17, 2013 |
| Dec 12, 2012 | A | Apt 9M · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF TOUCH UP CEILINGS TO PRESENT FURTER FLAKING 9 STY REAR APT 9M. LOCATED AT APT 9M | Mar 17, 2013 |
| Dec 12, 2012 | C | Apt 4P · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATHTUB BATHROOM 4 STY APT 4P ER1. , SECTION '' '' | Dec 18, 2012 |
| Dec 12, 2012 | C | Apt 4P · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE PIPE WASHBASIN AT 4 STY APT 4P BATHROOM ER1. , SECTION '' '' | Dec 18, 2012 |
| Dec 12, 2012 | A | § 27-2013 ADM CODE REMOVE THE DIRTY AND/OR LOOSE PAPER AND REPAPER OR PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS FROM 8TH TO 14TH STORIES (AKA 2 BAY CLUB DRIVE) AT PUBLIC HALL | Mar 17, 2013 |
| Dec 12, 2012 | C | Apt 2C · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK CEILING ( building 1 bay club drive) IN THE BATHROOM FROM NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Dec 18, 2012 |
| Dec 12, 2012 | A | Apt 14J · § 27-2013 ADM CODE REMOVE THE DIRTY AND/OR LOOSE PAPER AND REPAPER OR PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST AND WAET WALL ( AKA 2 BAY CLUB DRIVE ) IN THE 1st ROOM FROM EAST LOCATED AT APT 14J, 14th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 17, 2013 |
| Sep 10, 2009 | A | Apt 15Z · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WALL CABINET IN THE KITCHEN LOCATED AT APT 15Z, 15th STORY, APARTMENT AT EAST , SECTION ''2 BAYCL DR'', AT EAST | Dec 14, 2009 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 19C, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-F'' ORIGINAL VIOLATION 18978822 ISSUED 03-JUN-26 HAS BEEN UPGRADED TO | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 1:46 AM ET. BBL 4058937501.