Bronx · Block 3156 · Lot 127 · 10457

2081 Anthony Avenue

8 floors · 38 apartments · 27,300 sq ft · built 2023 · class D1 · owner of record: Swajay Anthony Llc

10open violations
$8,125ECB/OATH penalties owed
1HPD class C (immediately hazardous)
63dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 115 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 27,300 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1159 days
Next cycle year 2029

Open violations

ECB / OATH (3) · $8,125 owed
IssuedViolationHearingBalance
Mar 29, 2024Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED SIDEWALK SHED REMOVED FROM EXPOSURE 1 AND 4. UPON FURTHER RESEARCH NO APPROVAL FOR REMOVAL WAS GRANTED AS PER DOB RECORDS. CONTRARY TO SITE SAFETY PLAN ON PAGE 2 UNDER CLOSEOUT NO
#39526974H
Jun 7, 2024
IN VIOLATION
$625
Apr 28, 2023Construction CLASS - 1
FULL STOP WORK ORDER ISSUED ON MARCH 10TH, 2023. SWO STICKER POSTED AT EXPOSURE#2 TEMPORARY CONSTRUCTION FENCING. SWO RE-POSTED ON APRIL 25TH, 2023. NO DOB SWO STICKER ON APRIL 28TH, 2023., COMPLY WITH CODE
#39084917X
Nov 9, 2023
IN VIOLATION
$2,500
Apr 28, 2023Construction CLASS - 1
FULL STOP WORK ORDER ISSUED ON MARCH 3RD, 2023 AS PER THE BOROUGH COMMISSIONER'S ORDER. ON APRIL 28TH, 2023 I OBSERVED SEVEN CONSTRUCTION WORKERS INVOLVED IN CONSTRUCTION ACTIVITIES (FOUNDATION WORK) INCLUDING
#39084916Y
Nov 9, 2023
IN VIOLATION
$5,000
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (10) · C 1 · B 3 · A 6
IssuedClassViolationCorrect by
Sep 14, 2026AApt 9B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 18, 2026
Sep 14, 2026AApt 9B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 18, 2026
Sep 14, 2026BApt 9B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 19, 2026
Aug 13, 2026CApt 12B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 12B, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTHSep 8, 2026
May 21, 2026A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FECES ON THE FLOOR IN PUBLIC HALL STAIR CASE ''A'' AT PUBLIC HALL STAIRS, 1st STORYAug 24, 2026
May 4, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAAug 7, 2026
May 4, 2026A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION LOCK DOOR AT PUBLIC HALL AT COMPACTOR CLOSET, 1st STORYAug 7, 2026
May 4, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAAug 7, 2026
May 1, 2026BApt 7A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SAFETY COVER (LIGHT SWITCH COVER) AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM SOUTH AT WESTJun 5, 2026
May 1, 2026BApt 7A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CHAULK AROUND BATHTUB (SILLICONE) IN THE BATHROOM LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM SOUTH AT WESTJun 5, 2026

Issued in the last 120 days

DateSourceWhatNow
Sep 14, 2026HPD A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Sep 14, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Sep 14, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Aug 13, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 12B, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 6, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BOILER ROOMClosed
Jul 6, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CLOSER ARM AT BUILDING ENTRANCE , 1st STORYClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 1:02 AM ET. BBL 2031560127.

Look up another building