4 floors · 7,080 sq ft · built 1900 · class M1 · owner of record: Rg 200 W 97th Owner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 30, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION OBSERVED DEBRIS CHUTES INSTALLED AND IN USE AT THE SITE WERE OBSERVED TO BE CONSTRUCTED AND CONFIGURED CONTRARY TO THE APPROVED CHUTE PLAN. THE CHUTE ASSEMBLY DID NOT CONFORM TO THE AP #39561342N | Jan 7, 2027 PENDING | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 30, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OBSERVED DEBRIS CHUTES INSTALLED AND IN USE AT THE SITE WERE OBSERVED TO BE CONSTRUCTED AND CONFIGURED CONTRARY TO THE APPROVED CHUTE PLAN. THE CHUTE ASSEMBLY DID NOT CONFORM TO THE AP | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 2:31 AM ET. BBL 1018680038.