4 floors · 76,794 sq ft · built 1930 · class W4 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 76,794 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1925). Agency page | Dec 31, 2035 in 3333 days | Next due 2035 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 3, 2026 | Construction CLASS - 2 REISSUE ECB#35721538J FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT 2ND FL STAIR C,E 3RD FL STAIR F,G,H 4TH FL STAIR G,F,E,C ALL STAIRWAYS GLASS MESH PANELS CRACKED/SHATTERED THROUGHOUT VARIOUS #35736230P | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 3, 2026 | Construction CLASS - 2 REISSUE ECB#35721540Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL MULTIPURPOSE AREA BASEMENT AUDITORIUM #35736228X | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 3, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 1ST FL MULTIPURPOSE/EXITS NOT INSTALLED/PROVIDED EME #35736231R | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 3, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.NOTED:AT 1ST FL EXIT 8,MAIN ENTRY DOORS AREIN DISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR. #35736234M | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 3, 2026 | Construction CLASS - 2 REISSUE ECB#35721539L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT ROOF BULKHEAD/STAIR C BASEMENT BEHIND HALLWAY/STAGE WATER DAMAGE/STAINING TO WALLS/CEILINGS WITH SPALLING PAINT/PLASTER AND W #35736229H | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 6, 2025 | Construction CLASS - 2 REISSUE #35688958Y DATE OF ISSUE: 09-19-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF OF INSPECTION OBSERVED AND NOTED AT STAIRWAY "C" BULKHEAD WALL SPALLING/CRUMBLING PLASTER AT B #35721539L | Sep 5, 2025 POP/IN-VIO | $0 |
| Aug 6, 2025 | Construction CLASS - 2 REISSUE: 35688960N DATE OF ISSUE: 09-19-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT FLOOR 1ST FLOOR, BETWEEN 2ND FL 3 PIECE GLASS PANEL/WIRE MESH #35721538J | Sep 5, 2025 POP/IN-VIO | $0 |
| Aug 6, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL AT AUDITOR #35721540Z | Sep 5, 2025 POP/IN-VIO | $0 |
| Sep 19, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 4TH FLOOR STAIR C AND A. BROKEN/MISSING WIRE MESH GLASS PANELS IN STAIRCASE DIVIDERS. SEVERAL LOCATIONS NOTED HAVE BEEN REPLACED WITH COMBUSTIBLE #35688960N | Oct 21, 2024 POP/IN-VIO | $0 |
| Sep 19, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED SPALLING/CRUMBLING PLASTER AT STAIRWELL "C" BULKHEAD WALLS, 2ND FL CORRIDOR CEILING ABOVE RM #211A, AND AT CELLAR LEVEL WALL OUTSIDE THE SPRINKLER RO #35688958Y | Oct 21, 2024 POP/IN-VIO | $0 |
| Sep 26, 2018 | Unknown CLASS - 2 RESPODENT FAILED TO MAKE THE PROPER NOTIFICATION FOR MOBILE CRANE AFTER MAY 1,2018 TO THE DEPARTMENT.AT TIME OF INSPECTION IT WAS DISCOVERED THAT NO MOBILE CRANE(CN#73817)WAS ON SITE.NOTIFICATION WAS MADE OF TH #35306084X | Dec 20, 2018 DEFAULT | $10,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 3, 2026 | ECB | Construction: REISSUE ECB#35721538J FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT 2ND FL STAIR C,E 3RD FL STAIR F,G,H 4TH FL STAIR G,F,E,C ALL STAIRWAYS GLASS MESH PANELS CRACKED/SHATTERED THROUGHOUT VARIOUS | Open |
| Aug 3, 2026 | ECB | Construction: REISSUE ECB#35721540Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL MULTIPURPOSE AREA BASEMENT AUDITORIUM | Open |
| Aug 3, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 1ST FL MULTIPURPOSE/EXITS NOT INSTALLED/PROVIDED EME | Open |
| Aug 3, 2026 | ECB | Construction: EXIT DOOR NOT SELF-CLOSING.NOTED:AT 1ST FL EXIT 8,MAIN ENTRY DOORS AREIN DISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR. | Open |
| Aug 3, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT BASEMENT AUDITORIUM/EXIT 10 AND 6 EGRESS PASSAGE/WALKWAY BLOCKED/OBSTRUCTED WITH MULTIPLE OF VARIOUS ITEMS CHAIRS,BOXES,CLOTH RACKS ETC.REM:COMPLY | Closed |
| Aug 3, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED:AT 1ST FL EXIT 7 INSTALLED/USED SLIDE BOLT DOOR STOPPER/LOCKING DEVICE.REM:PROVIDE LE | Closed |
| Aug 3, 2026 | ECB | Construction: REISSUE ECB#35721539L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT ROOF BULKHEAD/STAIR C BASEMENT BEHIND HALLWAY/STAGE WATER DAMAGE/STAINING TO WALLS/CEILINGS WITH SPALLING PAINT/PLASTER AND W | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 10:17 PM ET. BBL 1019250019.