3 floors · 252,665 sq ft · built 1939 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page | Dec 31, 2026 in 58 days | 3 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 252,665 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1154 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 11049). Agency page | Dec 31, 2029 in 1154 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 10, 2026 | Construction CLASS - 2 REISSUE ECB #35692581P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. AT THE TIME OF INSPECTION NOTED: SMOKE DOOR TO CAFETERIA BY STAIR "I" NOT CLOSING PROPERLY, 1ST FLOOR STAIR "B" SMOKE DOOR DOES NOT #35727112J | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 10, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED CONCRETE PAVEMENT ON PARKING LOT HAVING MISSINGSECTIONS AND CRACKS CREATING AN EVEN SURFACE WHICH POSE A TRIPPING HAZ #35727113L | Mar 5, 2026 POP/IN-VIO | $0 |
| Feb 10, 2025 | Construction CLASS - 2 REISSUE#35676484N FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED INTERIOR FPSC DOORS AT 1ST FL AUDITORIUM ENTRANCE,BASEMENT EXIT#2-3,4-5 SMOKE DOORS & CAFETERIA ENTRY BY STAIR "I"NOT OPENING/CLOSIN #35692581P | Jun 17, 2025 POP/IN-VIO | $0 |
| Feb 10, 2025 | Construction CLASS - 2 REISSUE#35676483L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS.NOTED EMERGENCY LIGHTS NOT WORKING WHEN TESTED.AT BOYS/GIRLS GYM-4(LIGHTS),POO #35692582R | Jun 17, 2025 POP/IN-VIO | $0 |
| Feb 20, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:SMOKE DOORAT CAFETERIA,STAIR J DOOR,AUDITORIUM EXIT DOOR AT MAIN ENTRANCE,CLASSROOM DOOR#249 DO NOT CLOSE PROPERLY.REM:REPAIR AND/OR REPLACE DOOR. #35676484N | May 2, 2024 POP/IN-VIO | $0 |
| Feb 20, 2024 | Construction CLASS - 2 REISSUE#35655420L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDOR PER BC 1006.1;27-381.NOTED:THE FOLLOWING EMERGENCY EXIT LIGHTING FOUND INOPERAT #35676483L | May 2, 2024 POP/IN-VIO | $0 |
| Jan 23, 2023 | Construction CLASS - 2 REISSUE #35546590L (2/11/21) (B) #35650900H (2/23/22)(A).FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATED EXITS,EXIT DISCHARGES & PUBLIC CORRIDOR PER BC 1006.1;27-381. @ BOY'S GYM 3 1ST FL STA #35655420L | May 9, 2023 POP/IN-VIO | $0 |
| Mar 23, 2022 | Construction CLASS - 2 REISSUE35546590L NOTED:@2FL STAIRC,BY 236B,235B,240,241,1FL BY 140,138A,AUDITORIUM ENTRANCE (ALL),AUDITORIUM,BY 136,132,128,147,149,GYM ENTRANCE,BY EXIT 13,1FL GYM@BOTH SIDES,BY 111,101,BSMT B10,CAFETERIA,STAIR #35650900H | Jun 28, 2022 POP/IN-VIO | $0 |
| Feb 11, 2021 | Construction CLASS - 2 REISSUE#35495959P DATE 8-31-2020 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1;27-381. AT 1ST FL NEAR STAIR J. 1 PLACE 2 LIGHTS,AT 1ST #35546590L | May 18, 2021 POP/IN-VIO | $0 |
| Aug 31, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:THE FOLLOWING EMERGENCY LIGHTS ARE IN OPERATIVE 1ST FLOOR STAIR J BY 1 #35495959P | Nov 24, 2020 POP/IN-VIO | $0 |
| Feb 4, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC1006.1;27-381. NOTED: AT BOYS GYM 3 & AT GIRLS GYM 4 EMERGEMCY EXIT LIGHTING INOPERATIVE WHEN #35467867J | May 19, 2020 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00624 | DOB VIOLATION - ACTIVE |
| Nov 19, 2021 | ELEVATOR #9027/711902 | DOB VIOLATION - ACTIVE |
| Nov 19, 2021 | ELEVATOR #9027/711901 | DOB VIOLATION - ACTIVE |
| Nov 4, 2020 | ELEVATOR #9027/694460 | DOB VIOLATION - ACTIVE |
| Nov 4, 2020 | ELEVATOR #9027/694459 | DOB VIOLATION - ACTIVE |
| Nov 14, 2019 | ELEVATOR #9027/665070 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #04101 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 4:28 PM ET. BBL 4110490001.