7 floors · 31 apartments · 37,725 sq ft · built 2006 · class R4 · owner of record: Unavailable Owner
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $132,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 122 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 37,725 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 15, 2024 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION, I OBSERVED A 7 STORY AND BASEMENT; CONDOMINIUM WITH STEEL FRAMING AS PRIMARY STRUCTURAL SYSTEM. HOWEVE #35684044J | Feb 26, 2027 | $2,530 |
| Issued | Violation | Status |
|---|---|---|
| Jan 13, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITIONS.CELLAR PARKING GARAGE PIERS D-1 AT EXP 2/3 CRNR&D-1@EXP4 #3/4 CRNR WERE PREVIOUSLY CUT & INADEQUATELY SUPPORTD.D-1 PIER WAS CUT APPRX3FT TALL 14"X24".IMMED COMPLY W/COMMISSIONER'S ORDER #341660 (081524FEU30302PN)DATED 8/15/24 #FEU30201PN | DOB VIOLATION - ACTIVE |
| Aug 15, 2024 | CONSTRUCTION EMERGENCY WORK ORDER.REBAR WAS CUT&EXPOSED @TOP OF CELLAR SLAB& UNDERSIDE OF PIER.PIER 0-1 STRUCTURALLY COMPROMISED.OWNR TO IMMED RTAIN NYSPE TO SHORE/TEMP STBLIZE CELLAR CONC PIER D-1 @EXP2/3 CRNR SBMT MEANS&METHDS TO FEU FOR APPRVL #FEU30201PN | DOB VIOLATION - ACTIVE |
| Aug 15, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.CELLAR PARKING GARAGE PIERS D-1 AT EXP 2/3CRNR&D-1 @EXP4 @3/4 CRNR WERE PREVIOUSLY CUT& INADEQUATELU SUPPORTD.D-1 PIER WAS CUT APPRX 3FT TALL 14'X24".OWNR TO RTAIN PE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB TO RPAIR &/OR LEGALIZE WRK@CELLAR PIERS D-1,D-10, #FEU30202PN | DOB VIOLATION - ACTIVE |
| Apr 18, 2019 | ELEVATOR #9027/651002 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #09204 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 30, 2025 | Parking Structures FTC-PS-UNSAFE Unsafe PIPS compliance report filed | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 27, 2021 | B | Apt 6D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 1, 2021 |
| Sep 27, 2021 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY | Dec 31, 2021 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)