7 floors · 54,800 sq ft · built 1931 · class G1 · owner of record: Krw Operating Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 54,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 177 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 177 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $63,600 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 839 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1152 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1873). Agency page | Dec 31, 2033 in 2613 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 10, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING FACADE AND APPURTENANCES. NOTED: OBSERVEDTHERE ARE BROKEN WINDOW GLASSES AT EXP 3(N. ELEV). ALSO OBSERVED THEREARE SPALLING CONCRETE BEAMS AT 4TH, 6TH, AND 7TH FLOORS OF THE GARAGE, #35686259X | Nov 14, 2024 IN VIOLATION | $0 |
| Aug 2, 2024 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTE: RESPONDENT HAS FAILED TO COMPLY WITH PREVIOUS VIOL #35682550N DATED 04/04/2024 REQUIRING REPAIRS TO DAMAGED AREAS.-AT TIME OF INSPECTION, I OBSE #35683985R | Mar 6, 2025 IN VIOLATION | $0 |
| Aug 2, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BLDG FACADE AND APPURTENANCES.-NOTES AT TIME OF INSPECTION, I OBSERVED MULTIPLE CRACKED WINDOWS EXP #3 NORTH AND EXP #1 SOUTH HAS A BROKEN WINDOW 7FL STAIRWAY WINDOW LINE S-10. REME #35683986Z | Mar 6, 2025 IN VIOLATION | $0 |
| Apr 4, 2024 | Construction CLASS - 1 UNLAWFUL ACTS.FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.NOTE:AT THE TIME OF INSPECTION OBSERVED RESPONDENT FAILURE TO COMPLY WITH PREVIOUSVIOLATION#39102310X DATED 12/27/2023,WHICH REQUIRES RESPONDENT TO REPA #35682550N | Jul 11, 2024 IN VIOLATION | $0 |
| Dec 27, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED AT GARAGE 5TH, 6TH & 7TH FLOORS, VERTICAL & STEP CRACKS IN BRICK WALLS & COLUMNS AT THE NW & NE CORNERS. 7TH FLOOR COLUMN AT NORTH WALL MISSING BRICK #39102310X | Jul 11, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 2, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO SPALLING/CRACKING CONCRETE @ MULT LEVELS MOST PROMINENT LEVEL 1 WITH INADEQUATE SAFETY MEASURES. REMEDY: IMMEDIATELY PROVIDE ADEQUATE SAFETY MEASURES & OWNER TO RETAIN A NYS REGISTERED DESIGN PROF (RDP) TO EVALUATE,SUPERVISE & SUBMIT PROGRESS REPORTS TO: PARKINGSTRUCTURES #FA10701DO | DOB VIOLATION - ACTIVE |
| Dec 27, 2023 | CONSTRUCTION AT PARKING GARAGE 5TH, 6TH & 7TH FLOORS, VERTICAL & STEP CRACKS IN BRICK WALLS & COLUMNS AT THE NW & NE CORNERS. 7TH FLOOR BRICK COLUMN AT NORTH WALL MISSING BRICKS. AT CELLAR LEVEL HEAVILY RUSTED STEEL BEAM WITH TEMP SHORING IN PLACE. CELLAR LEVEL CONCRETE SLAB UNDERSIDE HAS AREAS OF SPALLING CONCR #23-03397 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 31, 2024 | Parking Structures FTC-PS-UNSAFE Unsafe report of parking structures filed. | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)