Brooklyn · Block 5339 · Lot 1 · 11218

205 Ocean Parkway

6 floors · 61 apartments · 55,800 sq ft · built 1963 · class D4 · owner of record: 207 Ocean Pkwy Apt Corp

4open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
68dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 55,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 312 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 433 days
Next cycle year 2027
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5339). Agency page

Dec 31, 2029
in 1164 days
Next due 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-06 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (4) · C 1 · B 2 · A 1
IssuedClassViolationCorrect by
Jul 2, 2026AApt 2F · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT GROUT JOINTS OF THE CERAMIC TILES AT SOUTH AND WEST WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 2F UPPER LEVEL, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 5, 2026
May 30, 2019CApt 2F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 20, 2019
Dec 1, 2009BApt 7D · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APRX 2 SQ FT AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 7D, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTJan 5, 2010
Dec 1, 2009BApt 7D · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APRX 5 SQ FT AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 7D, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTJan 5, 2010

Issued in the last 120 days

DateSourceWhatNow
Jul 2, 2026HPD A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT GROUT JOINTS OF THE CERAMIC TILES AT SOUTH AND WEST WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 2F UPPER LEVEL, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 2, 2026HPD B§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHClosed
Jul 2, 2026HPD B§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 11:26 PM ET. BBL 3053390001.

Look up another building