Queens · Block 10479 · Lot 4 · 11423

205-13 Jamaica Avenue

2 floors · 2 apartments · 2,626 sq ft · built 1931 · class S2 · owner of record: Jamaica Ave Advance Llc

6open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
43dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-27 (Accepted). Agency page

Dec 31, 2026
in 43 days
1 of 2 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 287 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 408 days
Next cycle year 2027

Open violations

ECB / OATH (0)

None open.

DOB (3)
IssuedViolationStatus
Feb 9, 2025CONSTRUCTION
DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT DUE TO EXTENSIVE FIRE, SMOKE AND WATER DAMAGE THROUGHOUT STRUCTURE ALONG WITH MULTIPLE HOLES IN ROOF AND MISSING WINDOWS.
#25-00235
DOB VIOLATION - ACTIVE
Feb 9, 2025CONSTRUCTION
STRUCTURE RENDERED NON COMPLIANT.AT TIME OF INSPECTION OBSERVED A DAMA GED FLOOR JOIST AT CELLAR LEVEL AND WATER DAMAGE . ALSO BROKEN WINDOWS AND OPEN ROOF AT 2ND FLOOR LEANING PROPERTY EXPOSED TO ALL OPEN ELEME NTS VACATE ENTIRE PROPERTY MAINTAIN BUILDING IN CODE COMPLIANT MA NNER
#C1201CM
DOB VIOLATION - ACTIVE
Feb 9, 2025CONSTRUCTION
REQUESTING AN ENGINEER REPORT DUE TO 1ST FLOOR JOIST BEING CUT AND IS UT OF POCKET. ALSO OBSERVED CHARRED JOIST AND TEMPORARY SHORING AT CEL LAR LEVEL. REMEDY ; OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECT IONS@BUILDINGS.NYC.GOV WITHIN 72 HOURS ADDRESSING ALL CONDITIONS W/ P LANS , PHOTOS , RE
#C1202CM
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Apr 22, 2026Structurally Compromised Buildings FTF-SC-INITL
Report due for structurally compromised property
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
HPD (1) · C 0 · B 0 · A 1
IssuedClassViolationCorrect by
Aug 29, 2022AApt 2R · § 27-2005 ADMIN. CODE: REFIT UPPER AND LOWER SOUTH WINDOW SASHES. IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHDec 2, 2022

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 3:21 PM ET. BBL 4104790004.

Look up another building