2 floors · 2 apartments · 2,626 sq ft · built 1931 · class S2 · owner of record: Jamaica Ave Advance Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-27 (Accepted). Agency page | Dec 31, 2026 in 43 days | 1 of 2 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 408 days | Next cycle year 2027 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 9, 2025 | CONSTRUCTION DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT DUE TO EXTENSIVE FIRE, SMOKE AND WATER DAMAGE THROUGHOUT STRUCTURE ALONG WITH MULTIPLE HOLES IN ROOF AND MISSING WINDOWS. #25-00235 | DOB VIOLATION - ACTIVE |
| Feb 9, 2025 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT.AT TIME OF INSPECTION OBSERVED A DAMA GED FLOOR JOIST AT CELLAR LEVEL AND WATER DAMAGE . ALSO BROKEN WINDOWS AND OPEN ROOF AT 2ND FLOOR LEANING PROPERTY EXPOSED TO ALL OPEN ELEME NTS VACATE ENTIRE PROPERTY MAINTAIN BUILDING IN CODE COMPLIANT MA NNER #C1201CM | DOB VIOLATION - ACTIVE |
| Feb 9, 2025 | CONSTRUCTION REQUESTING AN ENGINEER REPORT DUE TO 1ST FLOOR JOIST BEING CUT AND IS UT OF POCKET. ALSO OBSERVED CHARRED JOIST AND TEMPORARY SHORING AT CEL LAR LEVEL. REMEDY ; OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECT IONS@BUILDINGS.NYC.GOV WITHIN 72 HOURS ADDRESSING ALL CONDITIONS W/ P LANS , PHOTOS , RE #C1202CM | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 22, 2026 | Structurally Compromised Buildings FTF-SC-INITL Report due for structurally compromised property | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 29, 2022 | A | Apt 2R · § 27-2005 ADMIN. CODE: REFIT UPPER AND LOWER SOUTH WINDOW SASHES. IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 2, 2022 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 3:21 PM ET. BBL 4104790004.