20 floors · 398 apartments · 448,226 sq ft · built 1960 · class D3 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $1,035,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 115 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 448,226 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 428 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1699). Agency page | Dec 31, 2029 in 1159 days | Next due 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906137.REMEDY:SUBMIT ACCEPTABLE REQUIRE #37023714Y | Feb 9, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906136.REMEDY:SUBMIT ACCEPTABLE REQUIRE #37023715X | Feb 9, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906138.REMEDY:SUBMIT ACCEPTABLE REQUIRE #37023713M | Feb 9, 2023 POP/IN-VIO | $0 |
| Jun 22, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTED AT TIME OF INSPECTION MAIN ROOF LEVEL OPEN AND DETERIORATING MORTAR JOINTS W/ DISPLACED MASONRY BRICK ON MECHANICAL ROOM BULKHEAD JUST BELOW #35651134M | Sep 22, 2022 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00583 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00584 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00585 | DOB VIOLATION - ACTIVE |
| Nov 22, 2019 | FACADE SAFETY PROGRAM #HAZ88475 | DOB VIOLATION - ACTIVE |
| Nov 22, 2019 | FACADE SAFETY PROGRAM #HAZ88474 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Nov 22, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Nov 22, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 26, 2025 | B | Apt 15D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL AND CEILING IN THE BATHROOM LOCATED AT APT 15D, 15th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 31, 2025 |
| Sep 26, 2025 | B | Apt 15D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL AND CEILING IN THE BATHROOM LOCATED AT APT 15D, 15th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 31, 2025 |
| Sep 26, 2025 | B | Apt 15D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AND CEILING IN THE KITCHEN LOCATED AT APT 15D, 15th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 31, 2025 |
| Sep 26, 2025 | B | Apt 15D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL AND CEILING IN THE KITCHEN LOCATED AT APT 15D, 15th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 31, 2025 |