Brooklyn · Block 3963 · Lot 21 · 11207

204 Schenck Avenue

7 apartments · 5,076 sq ft · built 2024 · class C1 · owner of record: Aj Schenck Ave, Llc

1open violations
$64,125ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1158 days
Next cycle year 2029

Open violations

ECB / OATH (13) · $64,125 owed
IssuedViolationHearingBalance
Apr 23, 2025Unknown CLASS - 2
AT THE TIME OF MY INSPECTION I OBSERVED THAT AT AN ACTIVE JOB SITE THERE WERE NO CONSTRUCTION SUPERINTENDENT PRESENT TO OVER SEE THE SITE.
#39539440X
Apr 29, 2027
DEFAULT
$5,000
Mar 6, 2025Construction CLASS - 2
CONSTRUCTION FENCE SWING GATE EXP1 SWING INTO PUBLIC SPACE HAZARD TO PEDESTRIANS LEADS TO INJURIES OR FATAL,BC3307.7.2 STIPULATES SWING GATE SHALL NOT SWING INTO AREAS ACCESSIBLE TO THE PUBLIC.CORRECT SWING GAT
#39537672X
May 14, 2025
IN VIOLATION
$1,000
Jan 8, 2025Construction CLASS - 1
SWO WAS ISSUED ON 11/22/24 FOR NO EXTERIOR AND ROOF WORK ON EXPO#2,#4 20 FEET FROM EDGE. PREVIOUS PHOTOS SHOWED THE PARAPET WALL NOT COMPLETED AROUND ENTIRE ROOF, AND THE BULK HEAD NOT FRAMED, MISSING DOORS AND
#39535747M
Mar 19, 2025
DEFAULT
$12,500
Nov 22, 2024Unknown CLASS - 2
3309.11- DURING INSPECTION OBSERVED 4 STORY NEW BUILDING ACTIVE SITE CONSTRUCTION WORK IN PROGRESS, UPON FURTHER OBSERVED AT EXP 1 SIDEWALK HAS 2 TREE AND WITHOUT ANY PROTECTION, AS PER SSP AND CHAPTER 33BOTH
#39534631X
Oct 7, 2025
DEFAULT
$5,000
Nov 22, 2024Construction CLASS - 1
DURING INSPECTION AT 4 STORY NEW BUILDING ACTIVE SITE OBSERVED @ BULKHEAD LEVEL DECKING SEEMS IN PROGRESS AND THERE WAS NO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION - NO GUARD RAI
#39534622Y
Oct 7, 2025
DEFAULT
$12,500
Nov 22, 2024Unknown CLASS - 2
DURING INSPECTION 4 STORY NEW BUILDING ACTIVE SITE OBSERVED WORK IN PROGRESS, UPON FURTHER OBSERVED SITE HAS MULTIPLE VIOLATING CONDITION -NO GUARDRAIL ON BULKHEAD, FENCE WAS BROKEN AT EXP 3, MISSING ADJACENT
#39534627N
Jan 7, 2027
DEFAULT
$5,000
Nov 22, 2024Construction CLASS - 2
DURING INSPECTION OBSERVED 4 STORY NEW BUILDING ACTIVE SITE WORK IN PROGRESS ,UPON FURTHER OBSERVED AT EXP 3 CONSTRUCTION FENCE WAS BROKEN, FALL DOWN TO GROUND AND SITE WAS OPEN CONNECTION TO ADJACENT PROPER
#39534629R
Nov 20, 2025
DEFAULT
$2,500
Nov 22, 2024Construction CLASS - 2
DURING INSPECTION OBSERVED 4 STORY NEW BUILDING ACTIVE SITE INSTALLED SWS, UPON REQUEST TO SEE DAILY CHECKLIST & INSTALLATION LETTER FOR SWS, CS UPDATE LOGS, TOOLBOX TALK NONE WAS PROVIDED BY COMPETENT PERSON.
#39534632H
Oct 7, 2025
DEFAULT
$3,125
Nov 22, 2024Unknown CLASS - 1
3309.1-OBSERVED MISSING PROTECTION FOR ADJACENT PROPERTIES, EXP @2 MISSING ROOF & OH PROTECTION, EXP4 MISSING OH PROTECTION AND INADEQUATE ROOF PROTECTION, WHILE UNFINISHED CONSTRUCTION OPERATIONS. MISSING PROT
#39534621M
Oct 7, 2025
DEFAULT
$5,000
Oct 25, 2024Construction CLASS - 2
REBAR NOT INSTALLED AS PER PLANE IN INSIDE PARAPET WALL AND BULKHEAD. S-005.00 SECTION 3-3 INDICATES #5 REBAR FROM THE 3 FLOOR TO 5 FLOOR NEEDS TO BE 24" O.C . OBSERVED O.C TO 11FT 4IN AT TIME OF INSPECTION.
#39533843N
Jan 8, 2025
IN VIOLATION
$1,250
Oct 25, 2024Construction CLASS - 1
PARTIAL RESCIND ISSUED ON 10/15/24 THAT INDICATES NO WORK AT EXP 4. CONTRACTOR CONTINUE TO DO WORK. INSTALLED CMU FOR ROOF LEVEL PARAPET WALL AND BULKHEAD WHILE UNDER A STOP WORK ORDER.
#39533804K
Jan 8, 2025
IN VIOLATION
$5,000
Aug 30, 2024Construction CLASS - 2
OBSERVATION: VIOLATING CONDITION OBSERVED WORK PERFORMED WITHOUT AN ACTIVE PERMIT(FRAMING,MASONRY,CONCRETE POURING, SAFETY). NEW BUILDING PERMIT#B00993118-I1 EXPIRED ON 5/2/2024.OBTAIN PERMIT
#39532006L
Jun 2, 2025
DEFAULT
$3,125
Jul 30, 2024Construction CLASS - 2
NO EN DRAWING APPROVED FROM DOB PROVIDED IN THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS; PLEASE GO TO HTTPS://WWW1.NYC.GOV/SITE/BUILDINGS/CODES/ENERGY-CONSERVATION-CODE.PAGE AND
#39120194R
Jun 16, 2025
DEFAULT
$3,125
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 11:33 PM ET. BBL 3039630021.

Look up another building