Bronx · Block 3068 · Lot 26 · 10457

2030 Lafontaine Avenue

1 floors · 3,295 sq ft · built 1931 · class G1 · owner of record: Marrero Ruben

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
43dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 43 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Dec 23, 2009Construction CLASS - 2
WORK W/O A PERMIT. NOTED: WORK COMPLETED UNDER JOB #200418609 WHICH WAS PLACED ON HOLD (AUDIT FAILED) ON 9.5.1997. REMEDY: OBTAIN PERMIT.
#34811822J
Feb 19, 2010
DEFAULT
$0
Sep 17, 1998Construction Non-Hazardous
ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY PURSUANT TO ALTERATION 200418609. OBTAIN A VALID CERTIFICATE OF OCCUPANCY.
#34171192L
Sep 10, 1999
WRITTEN OFF
$0
DOB (2)
IssuedViolationStatus
Sep 2, 2021CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED GARAGE SPACE FRONTING LAFONTAINE AVE WITH SECTION OF ROOF APPROXIMATELY 30' X 20' COLLAPSED.
#21-00998
DOB VIOLATION - ACTIVE
Oct 9, 1997CONSTRUCTION

#61W
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 6)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 1:23 AM ET. BBL 2030680026.

Look up another building