1 floors · 1,870 sq ft · built 1931 · class K1 · owner of record: Rassias Peter
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 774 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 17, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39131628Z AS OF 3/17/2026, FILE A CERTIFICATE OF #39180785N | May 18, 2027 DEFAULT | $3,125 |
| Nov 25, 2025 | Site Safety CLASS - 1 FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENT AT SITE AS REQUIRED. AT TIME OF INSPECTION, DEMO AND STRUCTURAL WORK WERE FILED ON PLANS WITHOUT HAVE A DESIGNATED SUPER ON PERMITS OR ON S #39168233N | Jan 13, 2027 DEFAULT | $10,030 |
| Mar 20, 2025 | Construction CLASS - 1 NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 WORK WITHOUT A PERMIT VIOLATION ISSUED ON 11/30/24 FOR CREATING AN EXTENSION AT THE REAR YARD WITH MEZZANINE LEVEL WITH INSTALLED WASHERS AND DRYERS. NO PERMIT O #39142320X | Apr 13, 2027 DEFAULT | $6,250 |
| Nov 30, 2024 | Construction CLASS - 1 OBSERVED EXTENSION ON REAR YARD LAUNDROMAT AND CREATED A MEZZANINE FLOOR AND INSTALLED ADDITIONAL WASHER & DRYER MACHINES. NO REAR EXTENSION PERMIT IN DOB RECORD., OBTAIN PERMIT #39131628Z | Nov 24, 2025 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Nov 30, 2024 | CONSTRUCTION OBSERVED AT TIME OF INSPECTION ROOF JOIST CHARRED, ROOF OPEN TO THE EL EMENT , ROOF OPEN TO THE ELEMENT WALLS DAMAGED , STORE FRONT WINDOWS O UT , STORE FRONT DAMAGED DUE TO FIRE #CER02RA | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Mar 26, 2025 | Structurally Compromised Buildings FTF-SC-INITL Report due for structurally compromised property | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 11:13 AM ET. BBL 5010030025.