11 floors · 114 apartments · 124,153 sq ft · built 2016 · class RM · owner of record: Hp 2030 Creston Housing Development Fund Company,
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 124,153 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $48,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 477 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2808). Agency page | Dec 31, 2028 in 791 days | Next due 2028 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Annual boiler inspection (6 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-21 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 1, 2024 | Construction CLASS - 1 FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMENTING THE CONDITIONS OF PSID#X0003841 BY AUGUST 1, 2024 DEADLINE. TO DATE, THE DEPARTMENT HAS #37029803N | Jan 3, 2025 IN VIOLATION | $2,500 |
| Sep 18, 2018 | Construction CLASS - 1 BC3301.2/FAILURE TO INSTITUTE SAFETY MEASURES NO FALL PROTECTION.NOTEAT TIME OF REMOVED OF HOIST COIL BY RESPONDENT MAKES -EDISON LAZO A WORKER EMPLOYED BY ROCK GROUP FELL APPROXIMATELY 8FT BECAUUSE THERE WAS N #35350609H | Sep 27, 2019 DEFAULT | $2,530 |
| Issued | Violation | Status |
|---|---|---|
| Apr 30, 2025 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00024 | DOB VIOLATION - ACTIVE |
| Dec 1, 2023 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2300689 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 8, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Active |
| Jun 24, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 | Active |
| Apr 30, 2025 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 1, 2023 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 19, 2026 | B | Apt 11B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET SEAL AT REFRIGERATOR DOORS IN THE KITCHEN LOCATED AT APT 11B, 11th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 23, 2026 |
| Oct 19, 2026 | B | Apt 11B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM THE BUILDING ENTRANCE DOOR UP TO PANEL AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 11B, 11th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 23, 2026 |
| Jul 2, 2026 | B | Apt 5H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10SQ.FT AT EAST WALL AND WEST WALL AT BATHTUB IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Aug 6, 2026 |
| Jun 30, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT STAIRWAY B FIRE DOOR AT PUBLIC HALL, 5th STORY | Jul 14, 2026 |
| Jun 30, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT COMPACTOR CLOSET, 8th STORY | Jul 14, 2026 |
| Jun 30, 2026 | B | Apt 8F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 8F, 8th STORY, 5th APARTMENT FROM SOUTH AT WEST | Aug 4, 2026 |
| Jun 30, 2026 | B | Apt 8F · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 8F, 8th STORY, 5th APARTMENT FROM SOUTH AT WEST | Aug 4, 2026 |
| Jun 30, 2026 | C | Apt 8F · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 8F, 8th STORY, 5th APARTMENT FROM SOUTH AT WEST | Jul 6, 2026 |
| Mar 10, 2026 | B | Apt 6L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOORS BASE CABINET IN THE KITCHEN LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Apr 14, 2026 |
| Mar 10, 2026 | B | Apt 6L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Apr 14, 2026 |
| Mar 10, 2026 | B | Apt 6L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE DOOR KNOB IN THE BATHROOM LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Apr 14, 2026 |
| Mar 9, 2026 | A | Apt 4L · § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 12, 2026 |
| Mar 9, 2026 | B | Apt 4L · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK. IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 13, 2026 |
| Oct 2, 2025 | B | Apt 8K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EXHAUST VENT AT CEILING IN THE BATHROOM LOCATED AT APT 8K, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 6, 2025 |
| Oct 2, 2025 | A | Apt 8K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 8K, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 5, 2026 |
| Oct 2, 2025 | B | Apt 8K · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTLINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 8K, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 6, 2025 |
| Oct 2, 2025 | A | Apt 8K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH AND SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 8K, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 5, 2026 |
| May 23, 2025 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-C'', AT SOUTH | Jun 27, 2025 |
| May 23, 2025 | B | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-C'', AT SOUTH | Jun 27, 2025 |
| May 23, 2025 | B | Apt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUZZER AND RETURN VOICE INTERCOM SYSTEM FROM BUILDING VESTIBULE UP TO PANEL AT EAST WALL IN THE FOYER LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-C'', AT SOUTH | Jun 27, 2025 |
| May 23, 2025 | B | Apt 4B · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT SINK IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-C'', AT SOUTH | Jun 27, 2025 |
| May 23, 2025 | B | Apt 9H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUZZER AND RETURN VOICE INTERCOM SYSTEM FROM BUILDING VESTIBULE UP TO PANEL AT SOUTH WALL IN THE FOYER LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 27, 2025 |
| May 23, 2025 | B | Apt 4B · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-C'', AT SOUTH | Jun 27, 2025 |
| May 23, 2025 | B | Apt 4B · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-C'', AT SOUTH | Jun 27, 2025 |
| May 5, 2025 | A | Apt 3G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 8, 2025 |
| Mar 3, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 7, 2025 |
| Mar 3, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 7, 2025 |
| Mar 3, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 7, 2025 |
| Mar 3, 2025 | C | Apt 2D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 29, 2025 |
| Mar 3, 2025 | B | Apt 2D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING AND BEHIND WEST WALL. IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 7, 2025 |
| Mar 3, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 7, 2025 |
| Sep 3, 2024 | C | Apt 3G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 29, 2024 |
| Sep 3, 2024 | B | Apt 3G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 8, 2024 |
| Aug 30, 2024 | B | Apt 3G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5 SQFT AT CEILING IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16941369 ISSUED 01-MAY-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3 | Oct 4, 2024 |
| Jun 13, 2024 | B | Apt 3G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING ( APPROX 4 SQFT) IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16667217 ISSUED 12-FEB-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3 | Jul 18, 2024 |
| May 9, 2024 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY | Aug 12, 2024 |
| May 6, 2024 | A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS 'A' AND 'B', ALL STORIES AT PUBLIC HALL STAIRS | Aug 9, 2024 |
| May 2, 2024 | C | Apt 8F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8F, 8th STORY, 5th APARTMENT FROM SOUTH AT WEST | May 28, 2024 |
| Mar 27, 2024 | B | Apt 9C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 1, 2024 |
| Mar 27, 2024 | C | Apt 9C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 22, 2024 |
| Mar 27, 2024 | C | Apt 9C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERABLE MORTISE DOOR LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 2, 2024 |
| Mar 27, 2024 | B | Apt 9C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 1, 2024 |
| Mar 27, 2024 | A | Apt 9C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS, WALLS, DOORS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 30, 2024 |
| Mar 27, 2024 | B | Apt 9C · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 1, 2024 |
| Mar 27, 2024 | B | Apt 9C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND BUZZER/RETURN INTERCOM SYSTEM BUILDING ENTRANCE TO IN THE FOYER LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 1, 2024 |
| Feb 15, 2024 | C | Apt 9C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''w'', AT WEST | Mar 12, 2024 |
| Feb 15, 2024 | C | Apt 9C · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''w'', AT WEST | Feb 29, 2024 |
| Feb 15, 2024 | B | Apt 9C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM BUZZER SYSTEM FROM BUILDING ENTRANCE DOOR TO APT 9C IN THE ENTRANCE LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''w'', AT WEST | Mar 21, 2024 |
| Feb 14, 2024 | A | Apt 3G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 19, 2024 |
| Feb 14, 2024 | B | Apt 3G · § 27-2005 ADM CODE PROVIDE DOOR SWEEP AT DOOR IN THE ENTRANCE LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 20, 2024 |
| Feb 14, 2024 | B | Apt 5J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH | Mar 20, 2024 |
| Feb 14, 2024 | B | Apt 5J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH | Mar 20, 2024 |
| Feb 14, 2024 | B | Apt 3G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM BUILDING ENTRANCE TO APARTMENT WEST WALL IN THE FOYER LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 20, 2024 |
| Mar 31, 2023 | C | Apt 2H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY | Apr 26, 2023 |
| Feb 21, 2023 | C | Apt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 19, 2023 |
| Jun 9, 2022 | B | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER LOCK INSTALLED AT BUILDING ENTRANCE DOOR , 1st STORY | Jul 14, 2022 |
| May 16, 2022 | B | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD ENTRANCE DOOR IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 20, 2022 |
| May 16, 2022 | B | Apt 4B · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 20, 2022 |
| May 12, 2022 | B | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 16, 2022 |
| May 12, 2022 | B | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE 4th ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 16, 2022 |
Showing 60 of 85. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET SEAL AT REFRIGERATOR DOORS IN THE KITCHEN LOCATED AT APT 11B, 11th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 19, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM THE BUILDING ENTRANCE DOOR UP TO PANEL AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 11B, 11th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 8, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 11:02 AM ET. BBL 2028087501.