class V1 · owner of record: Callendar & Willette
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 18, 2026 | Construction CLASS - 1 FAILURE TO INSTITUTE SAFETY EQUIP MEASURES OR TEMPORARY CONSTRUCTION, "IMPROPER GUARDRAIL". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL. OB #35730809R | Nov 25, 2026 PENDING | $5,000 |
| Sep 18, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN/DISPLAY ON SITE "DOCUMENT REQUIRED BY BC CHAPTER 33". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED6 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL, OBSERVED CONCRETE BEI #35730808P | Nov 25, 2026 PENDING | $1,250 |
| Sep 18, 2026 | Construction CLASS - 1 FAILURE TO INSTITUTE SAFETY EQUIP MEASURE OR TEMPORARY CONSTRUCTION "NO TOW BOARD". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL. OBSERVED A #35730810Y | Nov 25, 2026 PENDING | $5,000 |
| Jul 7, 2026 | Construction CLASS - 1 AT INSPECTION OF THE ACTIVE 6-STORY BUILDING, TWO STAIRWAYS FROM THE FIRST FLOOR TO THE BASEMENT LEVEL, LOCATED AT EXP# 3 AND 4, LACKED REQUIRED HANDRAILS. THIS CONDITION CREATED A HAZARD TO WORKERS & PERSONNEL #39556351Z | Sep 16, 2026 IN VIOLATION | $2,500 |
| Jul 7, 2026 | Unknown CLASS - 2 ACTIVE 6-STORY BUILDING, EXPOSURE 3 LACKED REQUIRED OVERHEAD PROTECTION. REBAR COLUMNS EXTENDED APPROXIMATELY 12 FT ABOVE THE ADJOINING PROPERTY LINE WITH EQUIPMENT BELOW, CREATING AN IMMEDIATE HAZARD TO THE PU #39556350R | Apr 6, 2027 | $5,000 |
| Oct 31, 2024 | Construction CLASS - 2 AT TIME OF INSPECTION I OBSERVED UNDERNEATH THE SIDE WALK SHED WAS NOT ILLUMINATED AS REQUIRED BY CODE BC.3307.6.4.8. THIS CREATES HAZARDOUS CONDITIONS FOR PEDESTRIANS AS THEY WALK UNDERNEATH THE SHED: SLIPPING #39534014K | Jan 8, 2025 ADMIT/IN-VIO | $0 |
| Oct 31, 2024 | Unknown CLASS - 2 SITE WAS IN DEMO PHASE WITH A SHED INSTALLED AROUND THE SITE. UPON CHECKING DEPARTMENT RECORDS ON BIZ AND DOB NOW. IT REVEALS THAT NO SHED PERMIT WAS EVER ISSUED TO THIS ADDRESS ON FILE. A PREVIOUS DEMO PERMIT #39534013Z | Jan 8, 2025 ADMIT/IN-VIO | $0 |
| May 27, 2024 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OF A 3 STORY NEW BUILDING, I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE #1& 2 WITH A VALID PERMIT EXPIRATION DATE 07-01-2024, ALSO SIDEWALK SHED POST/LEG AT THE CORNER OF NOSTRAND #39528997J | Aug 7, 2024 DEFAULT | $0 |
| Feb 9, 2024 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OF A 3 STORY BUILDING DEMOLITION PHASE, I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE # 1 & 2 WITH A VALID PERMIT DATE: 07-01-2024 AND WITH THE FOLLOWING OBJECTION INOPERABLE LIGHT #39525494Y | Sep 20, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 5, 2019 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST #03074 | DOB VIOLATION - ACTIVE |
| Oct 8, 2010 | ELEVATOR ANNUAL INSPECTION / TEST #04154 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
| Oct 8, 2010 | Elevators VCAT1 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Sep 18, 2026 | ECB | Construction: FAILURE TO INSTITUTE SAFETY EQUIP MEASURES OR TEMPORARY CONSTRUCTION, "IMPROPER GUARDRAIL". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL. OB | Open |
| Sep 18, 2026 | ECB | Construction: FAILURE TO MAINTAIN/DISPLAY ON SITE "DOCUMENT REQUIRED BY BC CHAPTER 33". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED6 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL, OBSERVED CONCRETE BEI | Open |
| Sep 18, 2026 | ECB | Construction: FAILURE TO INSTITUTE SAFETY EQUIP MEASURE OR TEMPORARY CONSTRUCTION "NO TOW BOARD". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL. OBSERVED A | Open |