5 floors · 24 apartments · 20,350 sq ft · built 1940 · class C7 · owner of record: 125 Realty Property Owner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-30 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 17, 2026 | Construction CLASS - 2 NOTED BUSINESS ACCESSORY SIGN RAPPED FROM EXP.#1 TO EXP. #2 ABOVE 2ND FL, APPROX.30'X 3' IN TOTAL COPY" THE LUXE TOUCH NAILS" WITH GOLD LETTERS ON BLUE BACKGROUND & CANOPY AT EXP.#1 APPROX. 6'X4'X3'H ABOVE BUIL #39204518M | Dec 3, 2026 PENDING | $1,250 |
| Apr 25, 2026 | Unknown CLASS - 1 I OBSERVED INSTALLATION OF GENERAL WIRING FOR RECEPTACLES , LIGHT SWITCHES AND RECESS LIGHTING WITHOUT AN ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT #39186477Z | Jul 9, 2026 IN VIOLATION | $0 |
| Apr 25, 2026 | Unknown CLASS - 2 I OBSERVED UNSAFE UNSUITABLE ELECTRICAL CONDITIONS USE OF NM CABLE FOR RECESS LIGHTING IN COMMERCIAL SPACE, LIVE OPEN SPLICES AND RECEPTACLES INSIDE AND OUTSIDE OF THE STORE., COMPLY WITH EC; FIX ALL CONDITIONS #39186478K | Jan 14, 2027 | $800 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 15, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 1, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER GLASS PANE AT BUILDING ENTRANCE DOOR | Oct 7, 2026 |
| Jun 17, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR LEADING TO NORTH SECTION AT PUBLIC HALL, 2nd STORY, SECTION AT NORTH | Jun 23, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 1, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER GLASS PANE AT BUILDING ENTRANCE DOOR | Open |
| Sep 17, 2026 | ECB | Construction: NOTED BUSINESS ACCESSORY SIGN RAPPED FROM EXP.#1 TO EXP. #2 ABOVE 2ND FL, APPROX.30'X 3' IN TOTAL COPY" THE LUXE TOUCH NAILS" WITH GOLD LETTERS ON BLUE BACKGROUND & CANOPY AT EXP.#1 APPROX. 6'X4'X3'H ABOVE BUIL | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 1:19 PM ET. BBL 1017220039.