3 floors · 104,182 sq ft · built 1910 · class F5 · owner of record: Sunset Commercial Property Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 104,182 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 717). Agency page | Dec 31, 2027 in 429 days | Next due 2027 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 29, 2026 | Construction CLASS - 1 ATOI OBSERVED NEWLY INSTALLED COOPER PIPES AND VALVES ALONG THE CEILING OF 2ND FL LOCATION. WORK IS APPROX 50% COMPLETE. NO PLUMBING PERMIT ON FILE FOR SCOPE OF WORK., OBTAIN PERMIT #39190444Y | Sep 9, 2026 DEFAULT | $2,530 |
| May 29, 2026 | Construction CLASS - 1 ATOI OBSERVED CONSTRUCTION OF 3 NEW ROOMS WITH PARTITION WALLS. (2ND FL FRONT) 1 ROOM HAS WINDOWS INSTALLED. WORK IS APPROX 50% COMPLETE. NO PERMIT ON FILE FOR SCOPE OF WORK., OBTAIN PERMIT #39190445X | Sep 9, 2026 DEFAULT | $2,530 |
| May 29, 2026 | Construction CLASS - 1 ATOI OBSERVED THE INSTALLATION OF A NEW HAVC SYSTEM ALONG THE CEILING OF THE 2ND FL LOCATION (FRONT). WORK IS APPROX 40% COMPLETE. NO PERMIT ON FILE FOR MECHANICAL SYSTEM ., OBTAIN PERMIT #39190446H | Sep 9, 2026 DEFAULT | $2,530 |
| Issued | Violation | Status |
|---|---|---|
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #12634 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 9, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 9, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 9, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 6:35 PM ET. BBL 3007170001.