34 floors · 681 apartments · 617,104 sq ft · built 1965 · class RM · owner of record: Dorchester Tower Condomlinilum
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 617,104 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 487 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1140). Agency page | Dec 31, 2030 in 1531 days | Next due 2030 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-07 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 9, 2010 | ELEVATOR #9028/318875 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 15, 2026 | A | Apt 1704 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE BATHROOM LOCATED AT APT 1704, 16th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Jan 18, 2027 |
| Oct 15, 2026 | A | Apt 1704 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 1704, 16th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Jan 18, 2027 |
| Dec 9, 2022 | C | Apt 1704 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 1704, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Dec 23, 2022 |
| Dec 9, 2022 | B | Apt 1704 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER SASHES AT SOUTH AND WEST WINDOWS IN THE 3rd ROOM FROM EAST LOCATED AT APT 1704, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Jan 13, 2023 |
| Dec 9, 2022 | B | Apt 1704 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER WINDOW SASHES. IN THE 2nd ROOM FROM EAST LOCATED AT APT 1704, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Jan 13, 2023 |
| Dec 9, 2022 | B | Apt 1704 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER SASHES AT SOUTH 1 AND SOUTH 2 WINDOWS IN THE 1st ROOM FROM EAST LOCATED AT APT 1704, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Jan 13, 2023 |
| Nov 9, 2017 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Feb 12, 2018 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 15, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE BATHROOM LOCATED AT APT 1704, 16th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Open |
| Oct 15, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 1704, 16th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Open |
| Jul 17, 2026 | ECB | Unknown: DURING THE TIME OF INSPECTION OF A 33-STORY BUILDING I OBSERVED NO ACTIVE CONSTRUCTION. JERSEY BARRIERS WERE NOT INTERLOCKED OR FILLED WITH WATER OR SAND AT EXPOSURE 1, CREATING A HAZARD TO THE PUBLIC AND PROPE | Closed |
| Jul 17, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OF A 33-STORY BUILDING I OBSERVED NO ACTIVE CONSTRUCTION. AT EXPOSURE 1, JERSEY BARRIERS WERE NOT INTERLOCKED OR FILLED WITH WATER OR SAND, CREATING A HAZARD TO THE PUBLIC AND PROPERTY | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 12:58 AM ET. BBL 1011407501.