6 floors · 81 apartments · 73,806 sq ft · built 1931 · class D1 · owner of record: 20-30 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-08-13 (Accepted). Agency page | Dec 31, 2026 in 65 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 73,806 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 15767). Agency page | Dec 31, 2027 in 430 days | Next due 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 5, 2026 | Construction CLASS - 2 WORK WITH OUT A PERMIT IN APT 3H, FULL HEIGHT PARTITION ERECTING IN LIVINGROOM DIVIDING SPACE INTO A ROOM FOR SLEEPING. NO PERMIT ON FILE FOR WORK PERFORMED IN STUDIO APT., OBTAIN ALL PERMITS #39207098Z | Dec 15, 2026 PENDING | $1,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 10, 2026 | B | Apt 2G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 15, 2026 |
| Sep 10, 2026 | A | Apt 2G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH, THE KITCHEN , THE BATHROOM LOCATED AT APT 2G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Dec 14, 2026 |
| Apr 29, 2024 | A | Apt 5F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 2, 2024 |
| Apr 29, 2024 | B | Apt 5F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 3, 2024 |
| Apr 29, 2024 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 3, 2024 |
| Aug 6, 2020 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT 1B | Nov 9, 2020 |
| Nov 8, 2019 | C | Apt 1M · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER CEILING IN THE KITCHEN LOCATED AT CELLAR APT 1M, CELLAR APT AT WEST | Nov 16, 2019 |
| Nov 8, 2019 | C | Apt 1M · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT CELLAR APT 1M, CELLAR APT AT WEST | Nov 16, 2019 |
| Sep 16, 2019 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5G, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 21, 2019 |
| May 28, 2019 | A | Apt 7G · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PARTITION WITH A DOOR DIVIDING NORTH 4 ROOM INTO EAST1 AND EAST 2 CREATING OBSTRUCTION TO EXSIT TO FIRE ESCAPE IN '' EAST 1 '' PART IN THE | Aug 31, 2019 |
| Mar 7, 2019 | C | Apt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Mar 28, 2019 |
| Oct 1, 2018 | B | Apt 2M · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE 1st LIVING ROOM FROM NORTH LOCATED AT APT 2M, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 5, 2018 |
| Apr 25, 2018 | B | Apt 1M · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING. IN THE KITCHEN LOCATED AT APT 1M, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 30, 2018 |
| Feb 12, 2018 | A | Apt 7J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE PRIVATE HALLWAY , THE 1st ROOM FROM EAST, THE 4th ROOM FROM EAST AT SOUTH, THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 7J, 6th STORY, 1st APARTMENT FROM SOUTH A | May 18, 2018 |
| Jun 5, 2017 | B | Apt 1M · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE KITCHEN LOCATED AT APT 1M, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 10, 2017 |
| Feb 23, 2017 | B | Apt 2M · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2M, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 30, 2017 |
| Jan 14, 2016 | A | Apt 5K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 4th ROOM FROM EAST AT NORTH, THE 2nd ROOM FROM EAST, THE 4th ROOM FROM EAST AT SOUTH, THE 4th BATHROOM FROM EAST, THE 3rd BATHROOM FROM EAST LOCATED AT APT 5K, 5th | Apr 18, 2016 |
| Jan 4, 2016 | A | Apt 2F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 4th ROOM FROM NORTH, THE KITCHEN , THE FOYER , THE 1st ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 8, 2016 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 5, 2026 | ECB | Construction: WORK WITH OUT A PERMIT IN APT 3H, FULL HEIGHT PARTITION ERECTING IN LIVINGROOM DIVIDING SPACE INTO A ROOM FOR SLEEPING. NO PERMIT ON FILE FOR WORK PERFORMED IN STUDIO APT., OBTAIN ALL PERMITS | Open |
| Sep 10, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH, THE KITCHEN , THE BATHROOM LOCATED AT APT 2G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Jul 13, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER VESTIBULE DOOR AT BASEMENT AT PUBLIC HALL | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 3:25 PM ET. BBL 4157670007.