16 floors · 22 apartments · 69,649 sq ft · built 1928 · class D0 · owner of record: Fifth Ave Arcade Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 69,649 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $21,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 478 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 830). Agency page | Dec 31, 2030 in 1522 days | Next due 2030 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-29 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 2, 2026 | Unknown CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. DEFECTIVE/INADEQUATE UNSECURED NETTING ON SUPPORTED SCAFFOLD ON EAST AND WEST OF EX: 1-NORTH ELEVATION. REMEDY: COMPLY TO CODE SPECIFICATIONS. #35726802M | May 14, 2026 IN VIOLATION | $0 |
| Oct 16, 2025 | Unknown CLASS - 2 NOTE: AT TIME OF INSPECTION, I OBSERVED SIDEWALK IN PLACE AT EXPOSURES# 1, UPON REVIEWING DEPARTMENT RECORDS (BIS/DOBNOW), IT WAS FOUND THAT THE SIDEWALK SHED PERMIT (M08019903) WAS EXPIRED ON 10/07/2025. AN AC #39546060J | Mar 15, 2027 DEFAULT | $6,250 |
| Apr 14, 2025 | Cranes and Derricks CLASS - 2 AT OF INSPECTION OF A 16 STORY BUILDING OBSERVED SUSPENDED SCAFFOLD IN PLACE AT EXPOSURE 4. UPON REVIEW DEPARTMENT OF RECORD GC FAILED TO NOTIFY DEPARTMENT PRIOR TO INSTALLATION OF SUSPENDED SCAFFOLD AS PER COD #39144815R | Dec 11, 2026 PENDING | $2,530 |
| Apr 18, 2016 | Construction CLASS - 2 FAILURE TO MAINTAIN BLD IN CODE COMPLIANT MANNER.ON THE ABOVE DATE AT 2PM I OBSERVED NEW GAS RISER VALVE INSTALLED W. ASSOCIATED PIPING.VALVE WAS REPLCED W. LIVE/ACTIVE GAS(TO)SYSTEM.ENTIRE GAS SYSTEM MUST BE T #35141994M | Jul 21, 2016 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 2, 2026 | CONSTRUCTION FTM BLDG. OBSERVED AT EXP 2: MISSING/ DAMAGED BRICKWORK. OBSERVED AT EXP 4: BROKEN WINDOW PANE AT 13TH FLOOR & 11TH FLOOR, ERRODED MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE DEFECTIVE BRICKWORK & WINDOWS #SR0505RF | DOB VIOLATION - ACTIVE |
| Sep 11, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO DETERIORIATED MASONRY BRICKS AT NORTH/ WEST CORNER AND MISSING STONE UNITS AT 14TH FLOOR. REMEDY: IMMEDIATELY PROVIDE ADEQUATE SAFETY MEASURES AT WEST ELEVATION, EXPOSURE #4 #FA0501SB | DOB VIOLATION - ACTIVE |
| Nov 1, 2023 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FAILURE TO CORRECT SWARMP CONDITIONS #00082 | DOB VIOLATION - ACTIVE |
| Feb 21, 2023 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO LOOSE BRICK PANEL SECTION ON THE NORTH/ WEST CORNER OF THE BLDG AT 14FL LEVEL, ALSO STEPPED CRACKED/BULGING IN BRICK WORK AT THE SAME CORNER PARAPET WALL LEVEL. REMEDY: IMMED MAKE AREA SAFE/REMOVE ANY LOOSE HANGING MATERIAL UNDER SUPERVISION OF LIC PROF #FA0501WO | DOB VIOLATION - ACTIVE |
| Feb 20, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #910785 | DOB VIOLATION - ACTIVE |
| Aug 5, 2020 | ELEVATOR #9027/686538 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #00897 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #00033 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #01005 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #01348 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #01363 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #01302 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #01552 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #01611 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #02252 | DOB VIOLATION - ACTIVE |
| Aug 8, 2002 | LOCAL LAW 11/98 - FACADE #NRF50664 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #02387 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #02341 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #02356 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #02431 | DOB VIOLATION - ACTIVE |
| Jan 20, 1999 | LOCAL LAW 10/81 - ELEVATOR #00588 | DOB VIOLATION - ACTIVE |
| May 31, 1994 | LOCAL LAW 10/81 - ELEVATOR #00546 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 1, 2023 | Facades FISPFCS CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 20, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| Jan 20, 1999 | Elevators LL1081 | Active |
| Jan 20, 1999 | Elevators LL1081 | Active |
| Jan 20, 1999 | Elevators LL1081 | Active |
| Jan 20, 1999 | Elevators LL1081 | Active |
| May 31, 1994 | Elevators LL1081 | Active |
| May 31, 1994 | Elevators LL1081 | Active |
| May 31, 1994 | Elevators LL1081 | Active |
| May 31, 1994 | Elevators LL1081 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 24, 2009 | B | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PAINTED SPRINKLERHEADS AT 12 STY PUBLIC HALL. | Oct 29, 2009 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 7:16 AM ET. BBL 1008300046.