Manhattan · Block 576 · Lot 36 · 10011

2 West 13 Street

12 floors · 116,962 sq ft · built 1913 · class W6 · owner of record: New School/Social Res.

16open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
56dto Energy audit and retro-commissioning (2026)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 56 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 576). Agency page

Dec 31, 2026
in 56 days
Due this year
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $368,250 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 108 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 116,962 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 177 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 177 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1152 days
Next cycle year 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-27 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Dec 9, 2022Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #901253.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE
#37025157J
Apr 13, 2023
ADMIT/IN-VIO
$0
Oct 11, 2022Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS OR APPURTENANCES.NOTE AT THE TIME OF INSPECTION OBSERVED AT EXP1 NORTH ELEVATION,SPALLED BRICKS AND MISSING MORTAR JOINTS AT DIFFERENT LOCATIONS.ALSO OBSERVED AT EXP2
#35669105Z
Jan 19, 2023
ADMIT/IN-VIO
$0
Apr 11, 2017Construction CLASS - 2
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID CERT OF OCCUPANCY AS PER 28-118.3.1.AT TIME OF INSP OBSERVED ALTERED BLDG OCCUPIED W/A TEMP COFO#104253424T021 WHICH WAS EXPIRED ON 5-5-2014,BLDG IS BEING OCCUPIED W/NO
#35184556M
Sep 28, 2017
DEFAULT
$0
DOB (6)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#02297
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#02296
DOB VIOLATION - ACTIVE
Oct 9, 2025LANDMARK

#26-0298
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00123
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#02403
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#03515
DOB VIOLATION - ACTIVE
DOB NOW Safety (7)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 5, 2026, 3:40 PM ET. BBL 1005760036.

Look up another building