Manhattan · Block 1019 · Lot 7501 · 10036

2 Times Square

25 floors · 229,188 sq ft · built 1990 · class RC · owner of record: Sherwood 48 Assoc Jeffr Ey Katz

4open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
122dto Facade inspection report (Cycle 10A)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $5,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 122 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 229,188 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 191 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 191 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1166 days
Next cycle year 2029
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1019). Agency page

Dec 31, 2029
in 1166 days
Next due 2029

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Jun 30, 2025CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. DAMAGES OBSERVED TO HAVE BEEN SUSTAINED TO A POLE FALLING ONTO STRUCTURE BREAKING THE GLASS AFTER BEING IMPACTED BY A BUS.
#25-01411
DOB VIOLATION - ACTIVE
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
#00593
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Aug 24, 2026GHG Emissions - LL97 FTX-EN-LL97320
Active
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 24, 2026DOB SafetyGHG Emissions - LL97: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 5:40 AM ET. BBL 1010197501.

Look up another building