4 floors · 46,800 sq ft · built 1925 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 46,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 4, 2026 | Construction CLASS - 2 REISSUE#3574648Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNERNOTED:CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLR RM#'S-301,302,305.2ND FLR RM#'S 244,213,210,208,205,203.1ST FLR RM#S-110,111,104 #35734875N | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 4, 2026 | Construction CLASS - 2 REISSUE#35724647M FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESNOTED:AT CELLAR LEVEL IN BOILER ROOM,THERE IS WATER SEEPING THROUGH CONCRETE PAD CREATING SITTING WATER IN ROOM.REM:MAINTAIN EXTERIOR BUILDI #35734876P | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 4, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF CLOSING.NOTED:AT THE TIME OF INSPECTION OBSERVED ON1ST FLOOR-EXTERIOR EXIT#5 RIGHT DOOR DOES NOT SELF-CLOSE PROPERLY WHENTESTED.REM:REPAIR/REPLACE DOOR. #35734877R | Aug 24, 2026 POP/IN-VIO | $0 |
| Sep 17, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY, 3RD FLR- 304, 305, 302, 301. 2ND FLR-203, 202, 205, 204, 208, 210, 213, 244, 215, 216, 217. 1ST FLR-103, #35724648Y | Oct 24, 2025 POP/IN-VIO | $0 |
| Sep 17, 2025 | Construction CLASS - 2 RE-ISSUE 35677594Z. FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: AT CELLAR BOILER ROOM. OBSERVED WATER PUDDLE SEEPING THROUGH CONCRETE PAD. REMEDY: MAKE NECESSARY REPAIRS. #35724647M | Oct 24, 2025 POP/IN-VIO | $0 |
| Jul 29, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTED:AT CELLAR BOILER ROOM,OBSERVED WATER PUDDLE SEEPING THROUGH CONCRETE PAD.REM:MAKENECESSARY REPAIR. #35677594Z | Oct 8, 2024 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 4, 2026 | ECB | Construction: REISSUE#3574648Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNERNOTED:CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLR RM#'S-301,302,305.2ND FLR RM#'S 244,213,210,208,205,203.1ST FLR RM#S-110,111,104 | Open |
| Aug 4, 2026 | ECB | Construction: REISSUE#35724647M FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESNOTED:AT CELLAR LEVEL IN BOILER ROOM,THERE IS WATER SEEPING THROUGH CONCRETE PAD CREATING SITTING WATER IN ROOM.REM:MAINTAIN EXTERIOR BUILDI | Open |
| Aug 4, 2026 | ECB | Construction: EXIT DOOR NOT SELF CLOSING.NOTED:AT THE TIME OF INSPECTION OBSERVED ON1ST FLOOR-EXTERIOR EXIT#5 RIGHT DOOR DOES NOT SELF-CLOSE PROPERLY WHENTESTED.REM:REPAIR/REPLACE DOOR. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 12:26 AM ET. BBL 4032700001.