1 floors · 4 apartments · 1,131 sq ft · built 1930 · class C9 · owner of record: Farway Marina Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 433 days | Next cycle year 2027 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 10, 2023 | STRUCTURALLY COMPROMISED BUILDING FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE #00018 | DOB VIOLATION - ACTIVE |
| Jan 10, 2023 | STRUCTURALLY COMPROMISED BUILDING FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE #00019 | DOB VIOLATION - ACTIVE |
| Sep 26, 2022 | EMERGENCY FULL DEMOLISH BUILDING COORDINATE WITH FDNY BATTALION47 @ BAT047@FDNY NYC.GOV & 718-476-6247 DUE TO INCOMPLETE SEARCHES. COORDINATE WITH ED FOR DEMO AT 1 BEACH 85 STREET BUILDING ON SAME LOT #17177 | DOB VIOLATION - ACTIVE |
| Sep 26, 2022 | EMERGENCY FULLY DEMOLISH BUILDING.COORDINATE WITH FDNY BATTALION47 @ BAT04@FDNY NYC.GOV & 718-476-6247 DUE TO INCOMPLETE SEARCHES.COORDINATE WITH ED FOR DEMO AT 1 BEACH 85 STREET BUILDING ON SAME LOT #17178 | DOB VIOLATION - ACTIVE |
| Sep 26, 2022 | IMMEDIATE EMERGENCY ERECT APPROXIMATELY 15LINEAR FEET OF 8FT HIGH WOOD FENCE FROM BUILDING CORNER TO CHAIN LINKED FENCE ACROSS THE ENTRY WAY TO PREVENT UNAUTHORISED ACCESS #17175 | DOB VIOLATION - ACTIVE |
| Sep 23, 2022 | CONSTRUCTION FAIL TO MAINTAIN-BLDG IS SUPPRTD ON TIMBER PILES THAT ARE DTERIORATD TIMBER PILES EXTREMELY DTRIORATED @EXP4 SIDE OF BLDG.ROOFNG EXTREMLY DTRIORTD &ROOF APPEARS TO BE NO LONGER WATER TIGHT NYSPE STRCTRL ENGNR-IMMED EVAL ENTIRE BLDG &DSGN RPRS.FILE PRMTS BY 12/23/22.STRT WRK BY 1/14/23.CMPLT RPRS BY #FEU41401BS | DOB VIOLATION - ACTIVE |
| Sep 23, 2022 | CONSTRUCTION FTM-BLDG SUPPRTD ON TIMBER PILES W/IN HIGH WATER ZONE.TIMBER PILES DTRIORTD THRUOUT W/EXTRMLY DTRIORTD PILES @EXP4.OBSVD ADDTIONAL TIMBER PILES &WOOD FRMNG UNDR 1FL FRMNG INSTLLD W/O PRMTS @EXP4 NYSPE STRCTRL ENGNR-IMMED EVAL ENTIRE BLDG &DSGN RPRS.FILE PRMTS BY 12/23/22.STRT WRK BY 1/14/23.CMPLT RP #FEU41402BS | DOB VIOLATION - ACTIVE |
| Sep 23, 2022 | CONSTRUCTION PREMISES RENDERED NON-COMPLIANT DUE TO FIRE. NOTED: FIRE OCCURED WITH EXTERNAL DAMAGE THROUGH-OUT, HAVING CHARRED BEAMS, PARTITIONS, SMOKE + WALLS #ER02DM | DOB VIOLATION - ACTIVE |
| Sep 23, 2022 | CONSTRUCTION AT TIME OF INSPECTION OBSERVED EGRESS/INGRESS FOR THIS BUILDING COMPROMISED DU TO FIRE AT ADJACENT BUILDING. VACATE ENTIRE BUILDING. #22-03746 | DOB VIOLATION - ACTIVE |
| Sep 23, 2022 | CONSTRUCTION PREMISES RENDERED NON-COMPLIANT DUE TO FIRE. NOTED: FIRE OCCURED AT SAID ADDRESS WITH FIRE DAMAGE THROUGH-OUT, MISSING ROOF, FREE STANDING PARTITIONS #ER01DM | DOB VIOLATION - ACTIVE |
| Sep 23, 2022 | CONSTRUCTION AT TIME OF INSPECTION OBSERVED BUILDING FOUNDATION PILES IN DISREPAIR CONDITIONS AND IN DANGER TO FUTURE COLLAPSE. VACATE ENTIRE BUILDING #22-03748 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 10, 2023 | Structurally Compromised Buildings FTF-SC-INITL | Active |
| Jan 10, 2023 | Structurally Compromised Buildings FTF-SC-INITL | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 6:01 AM ET. BBL 4161100017.