1 floors · 25,920 sq ft · built 1958 · class K4 · owner of record: 2301 Stillwell Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page | Dec 31, 2026 in 69 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 25,920 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 15, 2025 | Construction CLASS - 2 NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 ELECTRICAL WORK WITHOUT PERMIT VIOLATION 39134162J ISSUED ON 12/31/24. ELECTRICAL PERMIT B01166492-I1-EL ISSUED ALLOWING FOR ELECTRICAL WORK., FILE A CERTIFICATE #39153675Z | Apr 7, 2026 IN VIOLATION | $1,250 |
| Dec 31, 2024 | Construction CLASS - 2 AT THE NEWLY CREATED SHOP AT 2317 STILLWELL AVE. BROOKLYN, NEW PLUMBING WORK DONE TO CREATE TWO-PIECE BATHROOM IN THE BACK OF THE NEW SHOP. NO PLUMBING PERMIT FOR THIS JOB AT THE TIME OF INSPECTION., OBTAIN ALL #39134163L | Apr 7, 2026 IN VIOLATION | $1,250 |
| Dec 31, 2024 | Unknown CLASS - 1 AT THE NEWLY CREATED SHOP AT 2317 STILLWELL AVE. BROOKLYN, NEW ELECTRICAL WORK DONE TO INSTALL NEW ELECTRIC METER, CIRCUIT BREAKER, SWITCHES, OUTLETS, ELECTRICAL FIXTURES. NO ELECTRICAL PERMIT FOR THIS WORK AT #39134162J | Apr 7, 2026 IN VIOLATION | $1,600 |
| Dec 31, 2024 | Construction CLASS - 2 AT THE TIME OF INSPECTION OBSERVED EXISTING LOCATION 2317 STILLWELL AVE. BROOKLYN SUBDIVIDED INTO TWO SHOPS TO CREATE NEW SHOP NEXT DOOR. ERECTED NEW PARTITION WALL TO SUBDIVIDE THE EXISTING BUILDING 2317 STILL #39134161H | Apr 7, 2026 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #08691 | DOB VIOLATION - ACTIVE |
| Sep 15, 2017 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST #04351 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Sep 15, 2017 | Elevators EVCAT1 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 10:59 AM ET. BBL 3071600001.