3 floors · 3 apartments · 3,000 sq ft · built 1930 · class S3 · owner of record: 279 St Nicholas Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-09 (Accepted). Agency page | Dec 31, 2026 in 61 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 13, 2018 | Plumbing CLASS - 2 AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS NEW GAS PIPING INSTALLED THAT HAS NOT BEEN TESTED. UTILITY COMPANY LOCKED HEAD OF GAS SERVICE., PERFORM TEST. #39000166N | Nov 13, 2018 IN VIOLATION | $0 |
| Aug 13, 2018 | Plumbing CLASS - 1 AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS METERS NEW GAS PIPING INSTALLED THAT HAS NOT BEEN TESTED. UTILITY COMPANY LOCKED HEAD OF SERVICE., PERFORM TEST #39001524Z | Apr 23, 2019 DEFAULT | $0 |
| Aug 13, 2018 | Plumbing CLASS - 1 AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS, GAS BEING SUPPLIED TO THE BUILDING WITHOUT DOB AUTHORIZATION AFTER NEW GAS PIPING WAS INSTALLED WITH A PERMIT., FILE FOR REQUIRED PERMITS AND #39001519Y | Apr 23, 2019 DEFAULT | $0 |
| Aug 13, 2018 | Construction CLASS - 1 AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS 2 UNIONS INSTALLED ON THE GAS PIPING THAT MATERIAL IS NOT CODE COMPLIANT IN THE PLACE THEY WERE INSTALLED. UTILITY COMPANY LOCKED HEAD OF GAS #39001523R | Apr 23, 2019 DEFAULT | $0 |
| Nov 22, 2016 | Boilers CLASS - 1 B154,3A,C,50A,51. PEERLESS CAST IRON,LP STEAM BLK,EC-05,OIL FIRED 3A,CADVANCED CORROSION AND MAJOR COLLAPSE OF THE FLUE PIPE. 50A-HEAVY ASH ACCUMULATION IN TH CHIMNEY BASE EMISSIONS BLOCKAGE; 51-HAZARDOUS OPERA #32088109L | Jun 6, 2017 DEFAULT | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 4:32 AM ET. BBL 4034420001.