1 floors · 39 apartments · 53,169 sq ft · built 1925 · class A8 · owner of record: Edgewater Park Owner Co
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 53,169 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5517). Agency page | Dec 31, 2027 in 435 days | Next due 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 5, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION, AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS WAS OBSERVED PILED IN THE REAR YARD OF THE PROPERTY. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE RISK, AS THE DEBRIS MATERIALS ARE C #39199243Z | Jan 15, 2027 PENDING | $2,500 |
| Aug 5, 2026 | Unknown CLASS - 1 AT THE TIME OF INSPECTION, ELECTRICAL WORK INSIDE A SHED IN THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE INSTALLATION APPEARS TO INCLUDE BX CONDUITS CONNECTING TO LIGHT SWITCHES, OUTL #39199224N | Jan 15, 2027 PENDING | $2,500 |
| Aug 5, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION, A MAKESHIFT SHED IN THE REAR YARD WAS FOUND TO BE INSTALLED WITHOUT A PERMIT. THE STRUCTURE APPEARS TO BE 80% COMPLETED DUE TO THE SIDE OF THE SHED MISSING , CONSTRUCTED USING 4X4 POS #39199266L | Jan 15, 2027 PENDING | $1,250 |
| Aug 5, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION, A WATER HEATER INSTALLATION IN A SHED AT THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE WORK APPEARS TO HAVE INVOLVED PLUMBING CONNECTIONS TO INSTALL THE WATE #39199219Z | Jan 15, 2027 PENDING | $2,500 |
| Aug 5, 2026 | Unknown CLASS - 1 AT THE TIME OF INSPECTION, UNSAFE CONDITIONS WERE OBSERVED THROUGHOUT THE REAR-YARD SHED DUE TO EXPOSED ELECTRICAL WIRING ACROSS THE INTERIOR. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE, AS THE SHED IS #39199230J | Jan 15, 2027 PENDING | $1,600 |
| Issued | Violation | Status |
|---|---|---|
| Mar 23, 2004 | CONSTRUCTION #101EC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 15, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 5, 2026 | ECB | Construction: AT THE TIME OF INSPECTION, AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS WAS OBSERVED PILED IN THE REAR YARD OF THE PROPERTY. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE RISK, AS THE DEBRIS MATERIALS ARE C | Open |
| Aug 5, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION, ELECTRICAL WORK INSIDE A SHED IN THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE INSTALLATION APPEARS TO INCLUDE BX CONDUITS CONNECTING TO LIGHT SWITCHES, OUTL | Open |
| Aug 5, 2026 | ECB | Construction: AT THE TIME OF INSPECTION, A MAKESHIFT SHED IN THE REAR YARD WAS FOUND TO BE INSTALLED WITHOUT A PERMIT. THE STRUCTURE APPEARS TO BE 80% COMPLETED DUE TO THE SIDE OF THE SHED MISSING , CONSTRUCTED USING 4X4 POS | Open |
| Aug 5, 2026 | ECB | Construction: AT THE TIME OF INSPECTION, A WATER HEATER INSTALLATION IN A SHED AT THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE WORK APPEARS TO HAVE INVOLVED PLUMBING CONNECTIONS TO INSTALL THE WATE | Open |
| Aug 5, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION, UNSAFE CONDITIONS WERE OBSERVED THROUGHOUT THE REAR-YARD SHED DUE TO EXPOSED ELECTRICAL WIRING ACROSS THE INTERIOR. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE, AS THE SHED IS | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 4:52 AM ET. BBL 2055170101.