27 floors · 75 apartments · 64,717 sq ft · built 1985 · class RM · owner of record: Bel Canto Condominium Assoc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-15 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $25,550 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 119 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 64,717 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1139). Agency page | Dec 31, 2029 in 1163 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 6, 2018 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35225670Y ISSUED ON 3/17/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.UNDWELLING VIOLATION FOR #35337869H | Feb 5, 2019 IN VIOLATION | $0 |
| Aug 2, 2017 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35225670Y ISSUED ON 03/07/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERMI #35275945J | Aug 2, 2018 IN VIOLATION | $0 |
| Jun 29, 2017 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.NOTED:PARTIAL SWO ISSUED ON MARCH,7TH,2017,INDICATES 90% WORK DONE BY THE COVERED PLAZA,OBSERVED 10% COMPLETION OF WORK DONE,AND THE SPACE IS CURRE #35272302M | May 17, 2018 IN VIOLATION | $0 |
| Mar 7, 2017 | Construction CLASS - 2 WORK W/O A PERMIT. NOTED: WORK IS BEING DONE IN POPS-PRIVATELY OWNED PUBLIC SPACES(COVERED PLAZA)W/O DEPT OF CITY PLANNING APPROVAL. AREA(POP)IS ABOUT 90% DONE MISSING SOME CEILING LIGHTS,TILES & SEATING. WORK #35225670Y | Jun 29, 2017 WRITTEN OFF | $0 |
| Jun 5, 2008 | Plumbing Hazardous USE OR INSTALLATION OF PLUMBING MATERIALS OR EQUIPMENT WHICH DOES NOT COMPLY WITH RS-16 LOCATION 1ST FL FOUND GAS FIRED COOKING EQUIPMENT CONNECTED WITH FLEXIBLE MUST BE HARD PIPED REMEDY: REMOVE NON COMPLYING #34610189M | Jul 31, 2008 IN VIOLATION | $0 |
| Oct 30, 2007 | Zoning Hazardous FAILURE TO COMPLY WITH A SPECIAL PERMIT (790651 ZSM) ISSUED BY CITY PLANNING COMMISSION ON A PLAN PREPARED BY "AARON MCDONALD ARCHITECT" DATED 12/20/05 PUBLIC SPACE AMENTISS INCLUDE SILK PLANTS SHOULD BE REPLAC #34607058P | May 1, 2008 WRITTEN OFF | $0 |
| Oct 30, 2007 | Zoning Hazardous FAILURE TO COMPLY WITH A SPECIAL PERMIT (790651 ZSM) ISSUED BY CITY PLANNING COMMISSION ON A PLAN PREPARED BY "AARON MCDONALD ARCHITECT" & DATED 12/20/05 DRAWING CPC-05 2 PROPOSED COVINGTON PLAZA ELEVATION LOOK #34607061X | May 1, 2008 WRITTEN OFF | $0 |
| Oct 30, 2007 | Zoning Hazardous FAILURE TO COMPLY WITH A SPECIAL PERMIT (790651 ZSM) ISSUED BY CITY PLANNING COMMISSION ON A PLAN PREPARED BY "AARON MCDONALD ARCHITECT" & DATED 12/20/05 DRAWING CPC-05 AS SHOWN ON PLAN THE "TRANSLUCENT" GLASS #34607060Y | May 1, 2008 WRITTEN OFF | $0 |
| Oct 30, 2007 | Zoning Hazardous FAILURE TO COMPLY WITH A SPECIAL PERMIT (790651 ZSM) ISSUED BY CITY PLANNING COMMISSION ON A PLAN PREPARED BY "AARON MCDONALD ARCHITECT" PATIO 12/20/05 DRAWING CPC-02 ! NO STORAGE OF BICYCLES ARE SHOWN ON THE P #34607059R | May 1, 2008 WRITTEN OFF | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 7:16 PM ET. BBL 1011397501.