6 floors · 82 apartments · 76,000 sq ft · built 1929 · class D7 · owner of record: 1990 Ellis Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 76,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3793). Agency page | Dec 31, 2033 in 2621 days | Next due 2033 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 22, 2026 | Elevators CLASS - 2 EXCESSIVE GAP OBSERVED ON THE RETURN SIDE OF THE ELEVATOR CAR DOOR. ADJUST TO COMPLY WITH APPLICABLE REQUIREMENTS. ELEVATOR PIT CONTAINS DEBRIS AND REQUIRES CLEANING. IN-CAR COMMUNICATION SYSTEM IS INSTALLED BU #39208964K | Jan 15, 2027 PENDING | $625 |
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #919583. REMEDY: SUBMIT ACCEPTABLE REQU #37035169X | Nov 21, 2025 IN VIOLATION | $0 |
| Jan 6, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING EXTERIOR WALL(S) OR APPURTENANCES. NOTE:-AT THE TIME OBSERVED AT EXPO #1 NORTH ELEVATION VERTICAL CRACK AND SEPARATED BRICK MASONRY 3RD AND 4TH FLOOR LEVEL DETERIORATING MORTAR JOIN #35689509N | Mar 21, 2025 IN VIOLATION | $0 |
| Jan 18, 2024 | Elevators CLASS - 1 12-L-10=DEFECTIVE IN CAR LIGHTING NOT WORKING; MUST REPAIR IMMEDIATELY/38-I-11=AC TRAVEL DAMAGED AND IN TWO PIECES MUST REPLACE AC TRAVEL AND RESTORE CAR LIGHTING AND POWER IMMEDIATELY. #38275512N | Sep 27, 2024 IN VIOLATION | $0 |
| Jan 10, 2020 | Construction CLASS - 2 WORK WITHOUT A PERMIT - DURING MY INSPECTION I INSPECTED APARTMENT #2G - I NOTED THAT THEY REMOVED PLY WOOD FLOOR IN KITCHEN AREA TO THE SUB FLOOR. - WORK WITHOUT A PERMIT. - FSWO - STOP ALL WORK. MAKE JOBSITE #39015565M | Dec 18, 2020 IN VIOLATION | $0 |
| Nov 16, 2015 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG NOTED:@RIGHT SIDE (EASEMENT) FOUND STEP CRACKS ABOVE 3RD FL WINDOWS @2 LOCNS.REM:REPAIR DEFECTS FORTHWITH.MAINTAIN BLDG. #35161539Z | Jan 8, 2016 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 6, 2025 | CONSTRUCTION EMERGENCY WORK ORDER. NOTE - AT TIME OF INSPECTION OBSERVED AT EXP#1 (NORTH ELEVATION) VERTICAL CRACK AND SEPERATED BRICK MASONRY 3RD/WTH FL LEVAL AT NORTHWEST CORNER CAUSING AN IMMEDIATE HAZ FOR PUBLIC SAFETY, NO SAFETY MEASURES IN PLACE. REMEDY: IMMEDIATELY PRIVIDE ADEQUATE SAFETY MEASURES AT EXP #LL20901MK | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 22, 2026 | A | Apt 2K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 25, 2027 |
| Oct 22, 2026 | B | Apt APT5B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 26, 2026 |
| Oct 22, 2026 | A | Apt APT5B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 25, 2027 |
| Oct 22, 2026 | B | Apt APT5B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULK AT TILES AROUND BATHTUB IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 26, 2026 |
| Oct 22, 2026 | B | Apt APT5B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THEN SQ 10 SQ FT OF MOLD ON CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 26, 2026 |
| Oct 22, 2026 | B | Apt APT5B · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 26, 2026 |
| Oct 22, 2026 | A | Apt 2K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 25, 2027 |
| Oct 22, 2026 | A | Apt 2K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 25, 2027 |
| Oct 22, 2026 | B | Apt APT5B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE KITCHEN LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 26, 2026 |
| Sep 14, 2026 | C | Apt 3B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''South'' | Oct 10, 2026 |
| Sep 14, 2026 | B | Apt 3B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB. IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''South'' | Oct 19, 2026 |
| Sep 14, 2026 | B | Apt 3B · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SEC | Oct 19, 2026 |
| Sep 14, 2026 | B | Apt 3B · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , S | Oct 19, 2026 |
| Feb 9, 2026 | C | Apt 2K · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH | Feb 7, 2026 |
| Nov 14, 2025 | A | Apt 6K · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR COVER AT WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6K, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Feb 17, 2026 |
| Oct 6, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED (GLASS PANE) AT 2ND FROM WEST AT NORTH WALL AT LOBBY, 1st STORY | Nov 10, 2025 |
| Jun 20, 2025 | C | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER SPRING BALANCE 1ST WINDOW FROM EAST AT SOUTH LOWER SASH IN THE 3rd ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''west'' | Jun 26, 2025 |
| Apr 28, 2025 | B | Apt 2K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17579827 ISSUED 26-DEC-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIV | Jun 2, 2025 |
| Feb 4, 2025 | B | Apt 2G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT EAST WALL , NORTH WALL, CEILING, CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17320308 ISSUED 03-OCT-24 HAS BEEN | Mar 11, 2025 |
| Dec 27, 2024 | B | Apt 2K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED CERAMIC TILES AT NORTH WALL BEHIND WATER CLOSET IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH | Jan 31, 2025 |
| Dec 11, 2024 | C | Apt 2K · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Dec 11, 2024 |
| Dec 11, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Dec 17, 2024 |
| Dec 11, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Dec 17, 2024 |
| Dec 11, 2024 | B | Apt 2K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Jan 15, 2025 |
| Nov 14, 2024 | B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL AT VESTIBULE, LESS THAN 10 SQ. FT. AT PUBLIC HALL, 1st STORY ORIGINAL VIOLATION 17114471 ISSUED 07-JUL-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Dec 19, 2024 |
| Oct 31, 2024 | B | Apt 6H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL GREATER THAN 10 SQ FT IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''central'' | Dec 5, 2024 |
| Oct 16, 2024 | C | Apt 2G · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 2nd APAR | Nov 11, 2024 |
| Oct 11, 2024 | C | Apt 2G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQUARE FEET AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST | Nov 6, 2024 |
| May 9, 2024 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES 2ND FROM WEST AT FRONT OF BUILDING AT SOUTH, 1ST. BALCONY, HOUSEHOLD ITEMS | Jun 13, 2024 |
| Apr 26, 2024 | B | Apt 2K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND NORTH WALL APPROXIMATELY 1SQFT IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' ORIGINAL VIOLATION 16547494 ISSUED 26-DEC-23 HAS BEEN UPGRADED TO CLASS | May 31, 2024 |
| Apr 2, 2024 | C | Apt 5A · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM EAST AT SOUT | Apr 28, 2024 |
| Mar 21, 2024 | C | Apt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Apr 16, 2024 |
| Mar 21, 2024 | B | Apt 2P · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2P, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 25, 2024 |
| Mar 21, 2024 | C | Apt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Apr 16, 2024 |
| Mar 21, 2024 | B | Apt 5M · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 25, 2024 |
| Mar 21, 2024 | B | Apt 4E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 25, 2024 |
| Mar 15, 2024 | C | Apt 2C · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Mar 19, 2024 |
| Mar 15, 2024 | C | Apt 2C · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Mar 19, 2024 |
| Feb 5, 2024 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BROKEN GLASS LITE AT BUILDING ENTRANCE DOOR (STREET TO VESTIBULE) , 1st STORY | Feb 11, 2024 |
| Jan 9, 2024 | B | Apt 6K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5 SQ.FT AT NORTH WALL, APPROX 5 SQ.FT AT WEST WALL, APPROX 5 SQ.FT AT CEILING. APPROX 5 SQ.FT EAST WALL IN THE BATHROOM LOCATED AT APT 6K, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH | Feb 13, 2024 |
| Dec 28, 2023 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM LOCKED AT BOILER ROOM | Jan 3, 2024 |
| Dec 27, 2023 | C | Apt 2K · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Dec 27, 2023 |
| Oct 23, 2023 | B | Apt 5L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 5L, 5th STORY, 7th APARTMENT FROM WEST AT NORTH | Nov 27, 2023 |
| Oct 23, 2023 | B | Apt 5L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5L, 5th STORY, 7th APARTMENT FROM WEST AT NORTH | Nov 27, 2023 |
| Oct 23, 2023 | B | Apt 5L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE BATHROOM LOCATED AT APT 5L, 5th STORY, 7th APARTMENT FROM WEST AT NORTH | Nov 27, 2023 |
| Oct 23, 2023 | B | Apt 5L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5L, 5th STORY, 7th APARTMENT FROM WEST AT NORTH | Nov 27, 2023 |
| Sep 26, 2022 | C | Apt 3J · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Sep 30, 2022 |
| Sep 26, 2022 | C | Apt 3J · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Sep 30, 2022 |
| Sep 12, 2022 | C | Apt 2K · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 6th APARTMENT FROM WEST AT NORTH | Oct 8, 2022 |
| Sep 12, 2022 | C | Apt 2K · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 6th APARTMENT FROM WEST AT NORTH | Oct 8, 2022 |
| Aug 13, 2021 | C | Apt 2K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 30 SQ FT AT CEILING, NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL, EAST WALL, SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL, WEST WALL IN THE BATHROOM LOCATED A | Sep 8, 2021 |
| Mar 31, 2021 | C | Apt 2G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Apr 26, 2021 |
| Mar 4, 2021 | C | Apt 2G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 30, 2021 |
| Jan 6, 2021 | C | Apt 2K · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 6, 2021 |
| Jan 6, 2021 | C | Apt 2K · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 6, 2021 |
| Apr 16, 2020 | B | Apt 5F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... NORTH WALL APPROX 1 SQ FT IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 13500828 ISSUED 12-DEC-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a( | May 21, 2020 |
| Apr 16, 2020 | B | Apt 5F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... EAST WALL IN CLOSET APPROX 1 SQ FT IN THE PRIVATE HALLWAY LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 13500809 ISSUED 12-DEC-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE C | May 21, 2020 |
| Feb 14, 2020 | C | Apt 2G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 6, 2020 |
| Jan 10, 2020 | B | Apt 2G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, NORTH WALL, EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 14, 2020 |
| Jan 10, 2020 | C | Apt 2G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 31, 2020 |
Showing 60 of 81. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 22, 2026 | ECB | Elevators: EXCESSIVE GAP OBSERVED ON THE RETURN SIDE OF THE ELEVATOR CAR DOOR. ADJUST TO COMPLY WITH APPLICABLE REQUIREMENTS. ELEVATOR PIT CONTAINS DEBRIS AND REQUIRES CLEANING. IN-CAR COMMUNICATION SYSTEM IS INSTALLED BU | Open |
| Oct 22, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 22, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Oct 22, 2026 | HPD A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Oct 22, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULK AT TILES AROUND BATHTUB IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Oct 22, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THEN SQ 10 SQ FT OF MOLD ON CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Oct 22, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Oct 22, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 22, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 22, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE KITCHEN LOCATED AT APT APT5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Sep 14, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''South'' | Open |
| Sep 14, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB. IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''South'' | Open |
| Sep 14, 2026 | HPD B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SEC | Open |
| Sep 14, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , S | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 6:49 PM ET. BBL 2037930039.