4 floors · 6 apartments · 7,360 sq ft · built 1905 · class S9 · owner of record: 373 Chauncey Realty Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-22 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 26, 2022 | Unknown CLASS - 2 ELECTRICAL WORK W/O PERMIT.AT TIME OF INSPECTION AT 4 STORY OCCUPIED MULTI-DWELLING OBSERVED IN APT #3R ONGOING CONSTRUCTION ACTIVITY NEWLY INSTALLED BX CABLE RUNS W/O ELECTRICAL WORK PERMIT FILED W/DEPT.STOP A #35578839Y | Aug 10, 2022 ADMIT/IN-VIO | $0 |
| Mar 26, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION OF 4 STORY OCCUPIED MULTI DWELLING OBSERVED WALL WITH WATER DAMAGE REMOVAL OF SHEET ROCK CEILING WITH SOME REMAINING AREAS HANGING LOO #35578840L | Aug 10, 2022 ADMIT/IN-VIO | $0 |
| Apr 30, 2020 | Plumbing CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. EXHAUST DISCHARGE MUST BE AS )CLEAR THAN 10 FEET FROM BLDG OPENING AS PER MC 501.2 & RS 13-1 SEC. 2-2.1.4. AT TIME OF INSPECTION EXHAUST SYSTEM FOR WORKING RAN #35477816Z | Mar 3, 2021 DEFAULT | $0 |
| Aug 12, 2016 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.OBSERVED AN EXHAUST HOOD AND WELDED DUCTWORK INSTALLED WITHIN THE PROPERTY LINE/AIRSPACE OF 197 HOWARD AVENUE APPROVED PLANS #35176320X | Oct 3, 2016 WRITTEN OFF | $0 |
| Aug 25, 2015 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES.NOTE:AT TIME OF INSPECTION FOUND AREA OF BRICK FACADE OVER EAST END OF STORE FRONT,APPROX. 20" HIGH X 6' LONG SEPARATED FROM BUILDING,CRACKED AND IN DANGER #35135418N | Oct 19, 2015 IN VIOLATION | $0 |
| Aug 25, 2015 | Construction CLASS - 3 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.PREMISES UNDER P.C. ALT #320849793,PERMIT EXP. 9/5/14 NOTE:APPLICATION FILED FOR STORE FRONT.AT TIME OF INSPECTION FOUND STORE #35135417L | Oct 19, 2015 IN VIOLATION | $0 |
| May 8, 2015 | Plumbing CLASS - 1 GAS BEING SUPPLIED TO BUILDING W/O INSPECTION AND CERTIFICATION BY DOBDURING PHYSICAL INSPECTION I OBSERVED THE GAS LINE FOR APT 2R ON THE 2ND FLR IN USE W/O GAS AUTHORIZATION. INSPECTIONS MUST BE DONE TO GET #35115739X | Jun 22, 2015 WRITTEN OFF | $0 |
| May 8, 2015 | Construction CLASS - 1 WORK W/O A PERMIT. ONE 5/8/15 AT 11:15AM DURING PHYSICAL INSPECTION I OBSERVED THAT THE GAS SUPPLY LINE FOR APT 2R ON THE 2ND FLR IS REMOVEDFROM THE EXISTING METER BAR AND CONNECED OFF THE METER SUPPLYING GAS #35115738Y | Jun 22, 2015 WRITTEN OFF | $0 |
| Dec 31, 2014 | Construction CLASS - 2 PIPING/OR EQUIPMENT INSTALLED IMPROPERLY IN CELLAR BOILER ROOM A GAS FIRED HOT WATER HEATER IN THE ACTIVE RUNNING OPERATION FLUE EXHAUST PIPE IS NOT CONNECTED TO CHIMNEY SPILLING C/O INTO CELLAR.PUTTING LIVES #35114851L | Sep 21, 2015 IN VIOLATION | $0 |
| Dec 31, 2014 | Construction CLASS - 1 WORK W/O PERMIT WORK NOTED: IN CELLAR BOILER ROOM 2 GAS FIRED HOT WATER HEATERS ARE INSTALLED W/WATER,GAS,FLUE PIPE WITH NO PERMITS WITH DOBALSO OBSERVED IN CELLAR WATER,WASTE LINES RAN TO A 2PC TILED BATHROOM #35114852N | Sep 29, 2015 IN VIOLATION | $0 |
| Dec 31, 2014 | Boilers CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: BOILER ROOM IS NOT SEALED AT WALLS CEILING TO SELF CONTAIN BOILER ROOM.THERE IS NO FRESH AIR FOR BOILER ROOM W/A FIRE DAMPER WHICH IS USED A COMBUSTION AIR FRO #35114853P | Sep 29, 2015 IN VIOLATION | $0 |
| Dec 31, 2014 | Plumbing CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER RE: PVC PIPE RAN IN A COMMERCIAL STORE CELLAR AND TO A 1ST FLR SINK.RMDY: REMOVE NON COMPLYING MATERIAL. #35114854R | Sep 29, 2015 IN VIOLATION | $0 |
| Jun 8, 2013 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER: FRONT DOOR LOCK BROKEN, FRONT DOOR GLASS BROKEN, ROOF DOOR MISSING LOCK & DOOR KNOB, OR HOOK,LIGHT AT LOBBY EXPOSED WIRES INOPERABLE. REMEDY: MAINTAIN BLDG #35015174J | Jul 29, 2013 IN VIOLATION | $0 |
| Mar 16, 2011 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY C/O AND DOB RECORDS CLASS 'A' APT CREATED AT 1 STY - 3RD APT FROM WEST (APT 1R) PARTITIONS ERECTED CREATING ROOMS. KITCHEN AND BATHROOM FIXTURES PRESENT. REMEDY:DISCONTINUE #34747156N | Jun 13, 2011 DEFAULT | $0 |
| Aug 22, 2007 | HPD Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O AND DEPT OF BLDG RECORDS.CLASS "A" APT CREATED AT 1 STY WALK IN APT INCREASE OF OCCUPANCY. REMEDY:RESTORE PREMISES TO LEGAL OCCUPANCY #34562266N | Oct 29, 2007 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09721 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #14021 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #35058 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #10539 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #10479 | DOB VIOLATION - ACTIVE |
| Nov 18, 2015 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00168 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #09477 | DOB VIOLATION - ACTIVE |
| Jul 29, 2015 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00189 | DOB VIOLATION - ACTIVE |
| Jul 29, 2015 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00188 | DOB VIOLATION - ACTIVE |
| Mar 25, 2015 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00098 | DOB VIOLATION - ACTIVE |
| Mar 25, 2015 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00097 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #08582 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #10697 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #09731 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #18634 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #32760 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Nov 18, 2015 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Jul 29, 2015 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 29, 2015 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 25, 2015 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 25, 2015 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 1, 2021 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| Feb 24, 2012 | B | Apt F1 · § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION , LOCATED AT APT F1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 30, 2012 |
| Feb 28, 2007 | C | Apt 4R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2007 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 2:35 PM ET. BBL 3015090001.