4 floors · 20 apartments · 20,880 sq ft · built 1930 · class C1 · owner of record: 199 Properties Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 6, 2026 | Construction CLASS - 1 AT EXPOSURE 1, VERTICAL AND HORIZONTAL CRACKS FROM 3RD STORY TO 4TH-STORY PARAPET WALL, STAIRS TO FIRE PASSAGEWAY SHOW DETERIORATED MASONRY/CONCRETE. EXPOSURE 2, LOOSE SECTIONS OF STUCCO AT 3RD-STORY, ADDITIONA #39183328L | Jan 28, 2027 | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Apr 6, 2026 | CONSTRUCTION REQUESTING A STRUCTURAL STABILITY REPORT FOR EXPOSURE 1 PARAPET WALL, WHERE CRACKS AND VISIBLE BRICK DISPLACEMENT INDICATE POTENTIAL INSTABILITY. ALSO, AT EXPOSURE 3 AND 4 SECTION WHERE BRICKS ARE MISSING FROM WALL WITH VISIBLE CRACKS THROUGHOUT ALL STORIES. #26-00971 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #20159 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 28, 2026 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM WEST AT NORTH WALL WALL, 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NO | Dec 1, 2026 |
| Aug 28, 2026 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BASEBOARD AT WEST WALL, BASEBOARD AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 1, 2026 |
| Aug 28, 2026 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st DOOR FROM NORTH AT EAST WALL, 1st DOOR FROM NORTH AT EAST WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st CLOSET FROM NORTH AT EAST WALL DOOR, NORTH WALL, | Dec 1, 2026 |
| Aug 28, 2026 | C | Apt 1B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, NORTH WALL, EAST WALL | Oct 5, 2026 |
| Aug 28, 2026 | C | Apt 1B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1s | Oct 5, 2026 |
| Aug 28, 2026 | C | Apt 1B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT WEST WALL, 1st CLOSET FROM WEST AT NORTH WALL DO | Oct 5, 2026 |
| Aug 28, 2026 | C | Apt 1B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Oct 5, 2026 |
| Aug 28, 2026 | C | Apt 1B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHRO | Oct 5, 2026 |
| Aug 28, 2026 | C | Apt 1B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, BASEBOARD AT EAST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WAL | Oct 5, 2026 |
| Aug 28, 2026 | C | Apt 1B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Oct 5, 2026 |
| Aug 28, 2026 | B | Apt 1B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 2, 2026 |
| Aug 28, 2026 | B | Apt 1B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL, SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 2, 2026 |
| Aug 28, 2026 | B | Apt 1B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 2, 2026 |
| Aug 28, 2026 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 1, 2026 |
| Aug 28, 2026 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 1, 2026 |
| Dec 4, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AND ALL WALLS AT BULKHEAD TO THE ROOF AT PUBLIC HALL, 4th STORY | Jan 8, 2024 |
| Dec 4, 2023 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT BULKHEAD TO THE ROOF AT PUBLIC HALL, 4th STORY | Jan 8, 2024 |
| Dec 4, 2023 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE AT STAIRE AT BULKHEAD TO THE ROOF AT PUBLIC HALL, 4th STORY | Jan 8, 2024 |
| Nov 16, 2020 | B | Apt 3A · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 21, 2020 |
| Nov 16, 2020 | B | Apt 3A · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 21, 2020 |
| Dec 16, 2019 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FRONT YARD OF BUILDING | Jan 20, 2020 |
| Jan 18, 2019 | B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AT LOBBY, 1st STORY | Feb 22, 2019 |
| Sep 17, 2018 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Dec 21, 2018 |
| Sep 17, 2018 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING 1ST STORY PUBLIC HALL | Dec 21, 2018 |
| Sep 17, 2018 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES FRONT STACK FRONT BUILDING | Dec 21, 2018 |
| Jun 19, 2018 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY | Jun 27, 2018 |
| Jun 22, 2015 | B | Apt 4A · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 27, 2015 |
| Jan 3, 2012 | C | SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT ENTRANCE DOOR TO BUILDING | Jan 9, 2012 |
| Jan 3, 2012 | B | SECTION 27-2005 ADM CODE PROVIDE AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT ENTRANCE DOOR TO BUILDING | Feb 7, 2012 |
| May 19, 2010 | A | Apt 4A · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 22, 2010 |
| Jul 28, 2006 | A | Apt 1-A · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 1-A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 24, 2006 |
| Aug 6, 2001 | B | Apt 1E · SECTION 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE TO 1 STY SOUTHEAST APT 1E. LOCATED AT APT 1E | Sep 15, 2001 |
| Aug 6, 2001 | B | SECTION 27-2005 ADM CODE PROVIDE BRACE AIR CONDITIONER 3 STY FRONT NORTH OF BLDG | Sep 15, 2001 |
| Aug 6, 2001 | B | Apt 4B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILINGS THRU-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 15, 2001 |
| Apr 22, 1997 | C | Apt 1E · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT NORTH AND WEST WALLS WEST ROOM 1 STY SOUTHEAST APT 1E ER1 97009180. , SECTION '' '' | May 12, 1997 |
| Apr 22, 1997 | C | Apt 1E · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT EAST NORTH AND SOUTH WALLS BATHROOM 1 STY SOUTHEAST APT 1E ER1 97009180. , SECTION '' '' | May 12, 1997 |
| Apr 22, 1997 | C | Apt 1E · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT AND OR PLASTER NORTH WALL EAST ROOM 1 STY SOUTHEAST APT 1E JOB 922 7197 ER1 97009180. , SECTION '' '' | May 12, 1997 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM WEST AT NORTH WALL WALL, 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NO | Open |
| Aug 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BASEBOARD AT WEST WALL, BASEBOARD AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st DOOR FROM NORTH AT EAST WALL, 1st DOOR FROM NORTH AT EAST WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st CLOSET FROM NORTH AT EAST WALL DOOR, NORTH WALL, | Open |
| Aug 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, NORTH WALL, EAST WALL | Open |
| Aug 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1s | Open |
| Aug 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT WEST WALL, 1st CLOSET FROM WEST AT NORTH WALL DO | Open |
| Aug 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Aug 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHRO | Open |
| Aug 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, BASEBOARD AT EAST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WAL | Open |
| Aug 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Aug 28, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 28, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL, SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 28, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 1:47 PM ET. BBL 3046590049.