Brooklyn · Block 7079 · Lot 51 · 11223

1983 West 10 Street

2 floors · 4 apartments · 3,120 sq ft · built 1926 · class C3 · owner of record: Won Wing Lau

8open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
50dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 415 days
Next cycle year 2027

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Oct 5, 2022Construction CLASS - 2
ALTERED BUILDING OCCUPIED WITHOUT A VALID CO AS PER 28-118.3.1 & 28-118.3.2: ATOI ON A WALK-UP APARTMENTS, IN R4-1 DISTRICT, OBSERVED THE BASEMENT THAT IS PERMITTED FOR ORDINARY USE OF PERMANENT DWELLINGS, IS U
#39071484R
May 8, 2023
IN VIOLATION
$0
Oct 5, 2022Quality of Life CLASS - 2
PERMANENT DWELLING USED FOR OTHER THAN PERMANENT-RESIDENTIAL PURPOSES, 28-210.3: ATOI ON A WALK-UP APARTMENTS, IN R4-1 DISTRICT, OBSERVED THE BASEMENT THAT IS PERMITTED FOR ORDINARY USE OF THE PERMANENT DWELLIN
#39071485Z
May 8, 2023
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (6) · C 2 · B 2 · A 2
IssuedClassViolationCorrect by
May 6, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 9, 2026
Feb 18, 2026CApt 2R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ...HOT WATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130F AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTFeb 24, 2026
Feb 18, 2026BApt 2R · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS ...DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMar 25, 2026
Feb 18, 2026BApt 2R · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES ...DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMar 25, 2026
Feb 17, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM ...DOOR LOCKED AT BASEMENT AT BOILER ROOMFeb 23, 2026
Jun 11, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 14, 2025

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 1:22 PM ET. BBL 3070790051.

Look up another building