Brooklyn · Block 2183 · Lot 16 · 11211

198 Wilson Street

6 floors · 48 apartments · 31,446 sq ft · built 1926 · class C1 · owner of record: Kol Trust

15open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
63dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 31,446 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 794 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-12 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
May 6, 2009Construction CLASS - 1
WORK W/O PERMIT. WORK NOTED: A REAR EXTENSION WITH TERRACE HAS BEEN CONSTRUCTED AT A REAR 1ST FLR APT CONSISTING OF STEEL TUBULAR COLUMNS CORRUGATED STEEL DECK (TAN). SHEET ROCK WALLS WINDOWS & DOORS. PLUMBING
#34775632N
Jun 29, 2009
IN VIOLATION
$0
May 6, 2009Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER. NOTE: NEW REAR EXTENSION ERECTED AT 1ST FLR BLOCKING REAR FIRE ESCAPE USE BY OCCUPANTS IN CASE OF FIRE/EMERGENCY,SECURITY BARS ON WINDOWS FOR APT AT CELLAR
#34775633P
Jun 29, 2009
IN VIOLATION
$0
DOB (5)
IssuedViolationStatus
Dec 1, 2023FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2301179
DOB VIOLATION - ACTIVE
Dec 1, 2022FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2201180
DOB VIOLATION - ACTIVE
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2005115
DOB VIOLATION - ACTIVE
Apr 22, 2016CONSTRUCTION
DUE TO MATZOT OVEN AT CELLAR SUSTAIN DAMAGE WHEN IGNITED AND FIRE ENGULF IT
#CNE01R
DOB VIOLATION - ACTIVE
Aug 12, 2010CONSTRUCTION
STOP ALL WORK EXCEPT TO MAKE SITE SAFE,OBTAIN PLANS AND PERMITS
#0101RM
VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Dec 1, 2023Energy Grade - LL33 FTP-EN-EGRDEA
Active
Dec 1, 2022Energy Grade - LL33 FTP-EN-EGRDEA
Active
Apr 29, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (5) · C 0 · B 4 · A 1
IssuedClassViolationCorrect by
Aug 2, 2010BApt 5B · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, APARTMENT AT EASTSep 6, 2010
Jul 12, 2010BApt 3C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 4th STORYAug 16, 2010
Jan 13, 2010BApt 3D · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT NORTHEASTFeb 17, 2010
Dec 30, 2009BApt 3D · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHFeb 3, 2010
Aug 13, 2008A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION STRUCTURE ERECTED ON METAL LANDING PROTRUDING FROM 3 STY LEVEL NORTH WALL OF WEST COURT.Nov 16, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 3:52 PM ET. BBL 3021830016.

Look up another building