5 floors · 10 apartments · 17,100 sq ft · built 1912 · class C1 · owner of record: 1970 University Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1139 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 30, 2025 | Construction CLASS - 3 FAILURE TO PROVIDE KEY FOR ACCESS TO HEATING SYSYEM BOILER ROOM AS PERHMC27-2033; 27-MISC,28-MISC, COMPLY WITH CODE; COMPLY WITH HMC 27-203.3 AND SUBMIT A CERTIFICATE OF CORRECTION #39146518J | Oct 17, 2025 IN VIOLATION | $250 |
| Sep 27, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #39029087Y ISSUED ON 09/23/20 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.REMEDY:COMPLY W/COMMISSIONER'S #35563297R | Dec 17, 2021 DEFAULT | $5,000 |
| Sep 27, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #39029086N ISSUED ON 09/23/20 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.REMEDY:COMPLY W/COMMISSIONER'S #35563296P | Dec 17, 2021 DEFAULT | $10,000 |
| Aug 4, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V39029086M ISSUED9/23/20 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.OCCUPANCY CONTRARY TO THAT ALLOWED BY C/O OR BLDGS DEPT RECORDS COMPLY W/COMMI #35535160H | Apr 24, 2023 IN VIOLATION | $3,125 |
| Aug 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39029087Y ISSUED ON 09/23/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. #35534768L | Apr 24, 2023 IN VIOLATION | $3,125 |
| Jun 17, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V39029086M ISSUED9/29/20 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C. #35532793Y | Sep 3, 2021 DEFAULT | $5,000 |
| May 19, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39029087Y ISSUED ON 09/23/20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR INSTALLING KEY LOCKI #35530602N | Aug 6, 2021 DEFAULT | $3,125 |
| Apr 23, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39029086M ISSUED ON 09/23/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR ILLEGAL OCCUPANCY IN THE BASEMENT. REMEDY: COMP #35530097L | Jul 16, 2021 DEFAULT | $3,125 |
| Mar 31, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#390209087Y ISSUED ON 09/23/20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BUI #35527270Z | Jun 18, 2021 DEFAULT | $6,250 |
| Dec 4, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39029086M ISSUED ON 09/23/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. OCCUPANCY CONTRARY TO C OF O AT BASEMENT LEVEL. #35523358P | Feb 19, 2021 DEFAULT | $3,125 |
| Dec 4, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39029087Y ISSUED ON 09/23/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. #35523359R | Feb 19, 2021 DEFAULT | $3,125 |
| Sep 23, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT REAR YARD (EXPOSURE 3) - EXCESSIVE ACCUMULATION OF CONSTRUCTION EQUIPMENT, GARBAGE & DEBRIS STORED BENEATH FIRE ESCAPE., REPAIR AND/OR REPLACE #39029088X | Apr 24, 2023 IN VIOLATION | $625 |
| Sep 23, 2020 | Construction CLASS - 1 CONTRARY TO C-OF-O 44048 WHICH INDICATES A 4 RM APT AT BSMT - AT TIME OF INSPECTION OBSERVED STORAGE SPACE CONVERTED INTO AN ADDL'T BDRM. TO INCREASE OCCUPANCY., DISCONTINUE ILLEGAL OCCUPANCY OR AMEND C OF O #39029086M | Jul 23, 2021 DEFAULT | $12,500 |
| Sep 23, 2020 | Construction CLASS - 2 W/O A PERMIT. NOTED: AT BSMT - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE BDRM IN-CONJUNCTION WITH BSMT APT., OBTAIN ALL PERMITS #39029089H | Nov 20, 2020 DEFAULT | $6,250 |
| Sep 23, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: AT BSMT APT - KEY LOCKING DEVICES INSTALLED AT ALL (3) BDRM DOORS INCLUDING ROOM #39029087Y | Nov 20, 2020 DEFAULT | $6,250 |
| Feb 20, 2014 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. THE FOLLOWING DEFECTS WERE NOTED IN APT 43 2ND BEDROOM, 3RD BEDROOM, BATHROOM, KITCHEN & VARIOUS CLOSETS. 1. CEILING ROOF CONSISTS OF CONTINUOUS SEEPAGE/LEAK. #35081324L | Jun 20, 2014 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 23, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00227 | DOB VIOLATION - ACTIVE |
| Dec 23, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00228 | DOB VIOLATION - ACTIVE |
| May 21, 2014 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00068 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Dec 23, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 23, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| May 21, 2014 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 2, 2026 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| Nov 10, 2026 | C | Apt 1S · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH 1ST WINDOW FROM NORTH IN THE 1st ROOM FROM EAST LOCATED AT APT 1S, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 16, 2026 |
| Nov 10, 2026 | C | Apt 1S · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE RADIATOR AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1S, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 16, 2026 |
| Oct 14, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT PUBLIC HALL ENTRANCE DOOR TO BUILDING TOP PANEL , 1st STORY | Nov 18, 2026 |
| May 18, 2026 | B | Apt 1N · § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, ELECTRIC RANGE INSTALLED IN THE KITCHEN LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 22, 2026 |
| May 15, 2026 | B | Apt 4N · § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, CONSISTING OF 220 VOLT LINE INSTALLED FROM ELECTRICAL PANEL TO ACCOMODATE ELECTRIC STOVE IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NO | Jun 19, 2026 |
| May 15, 2026 | B | Apt 2N · § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, CONSISTING OF 220 VOLT LINE INSTALLED FROM ELECTRICAL PANEL TO ACCOMODATE ELECTRIC STOVE IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM NO | Jun 19, 2026 |
| May 15, 2026 | B | Apt 1S · § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, CONSISTING OF 220 VOLT LINE INSTALLED FROM ELECTRICAL PANEL TO ACCOMODATE ELECTRIC STOVE IN THE KITCHEN LOCATED AT APT 1S, 1st STORY, 2nd APARTMENT FROM NO | Jun 19, 2026 |
| Feb 2, 2026 | C | Apt 4N · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 8, 2026 |
| Feb 2, 2026 | B | Apt 1S · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM/BELL BUZZER FROM ENTRANCE DOOR TO SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1S, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Mar 9, 2026 |
| Feb 2, 2026 | B | Apt 4N · §27-2033.3(B) CORRECT FAILURE TO INSTALL AN INTERNET CAPABLE TEMPERATURE REPORTING DEVICE IN ONE LIVING ROOM IN APARTMENT ... LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 9, 2026 |
| Dec 11, 2025 | A | Apt 3S · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF 220 VOLT LINE INSTALLED FROM ELECTRICAL PANEL TO ACCOMODATE ELECTRIC STOVE IN THE KITCHEN LOCATED AT APT 3S, 3rd STORY, 2nd A | Mar 16, 2026 |
| Dec 1, 2025 | C | Apt S1 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT S1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 7, 2025 |
| Nov 24, 2025 | C | Apt 1N · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 30, 2025 |
| Oct 28, 2025 | B | Apt 3N · §27-2033.3(B) CORRECT FAILURE TO INSTALL AN INTERNET CAPABLE TEMPERATURE REPORTING DEVICE IN ONE LIVING ROOM IN APARTMENT ... LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 2, 2025 |
| Apr 12, 2024 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM | May 17, 2024 |
| Oct 5, 2015 | B | Apt WIA · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM / BELL BUZZER SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT WIA, APARTMENT AT SOUTH | Nov 9, 2015 |
| Nov 20, 1990 | B | Apt 3S · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL AND RETURN BUZZER SYSTEM FROM 1ST STY VESTIBULE TO 3RD STY SOUTH APT 3S. , SECTION '' '' | Jan 7, 1991 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 10, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH 1ST WINDOW FROM NORTH IN THE 1st ROOM FROM EAST LOCATED AT APT 1S, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Nov 10, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE RADIATOR AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1S, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Oct 14, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT PUBLIC HALL ENTRANCE DOOR TO BUILDING TOP PANEL , 1st STORY | Open |
| Oct 6, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1S, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed |
| Oct 6, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 9:57 AM ET. BBL 2028680125.