3 floors · 90,500 sq ft · built 1952 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 52 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 90,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 173 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 173 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 417 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4994). Agency page | Dec 31, 2034 in 2974 days | Next due 2034 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-06 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 21, 2026 | Construction CLASS - 2 REISSUE ECB#35692007K EXIT DOOR NOT SELF CLOSING.NOTED:AT 2ND FL HALLWAY SMOKE DOOR NEAR RM 208 1ST FL EXIT 2,7,CAFETERIA,LIBRARY RM 113 DOORS ARE ALL INDISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR #35732457L | Jun 1, 2026 POP/IN-VIO | $0 |
| Apr 21, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT OUTSIDEPLAYGROUND NEAR EXIT 8 CONCRETE FLOOR CRACKED/DETERIORATING/MISSING CREATING A TRIPPING/FALLING CONDITION. #35732460M | Jun 1, 2026 POP/IN-VIO | $0 |
| Apr 21, 2026 | Construction CLASS - 2 REISSUE ECB#35692006Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL AUDITORIUM EMERGENCY LIGHTS NOT WORKI #35732458N | Jun 1, 2026 POP/IN-VIO | $0 |
| Apr 21, 2026 | Construction CLASS - 2 REISSUE ECB#35692005R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 1ST FL LEFT SIDE REAR OF AUDITORIUM/STAIR H WINDOW/WALLWITH VERTICAL CRACKS THROUGHOUT.REM:REPAIR AND/OR REPLACE. #35732459P | Jun 1, 2026 POP/IN-VIO | $0 |
| Apr 21, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 1ST FL LIBRARY RM 117 NOT INSTALLED/PROVIDED WITHOUT #35732461Y | Jun 1, 2026 POP/IN-VIO | $0 |
| Apr 16, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: IN THE AUDITORIUM STAGE AREA TWELVE LIGHTS WERE NOT OPERATIONAL #35692006Z | Nov 7, 2025 POP/IN-VIO | $0 |
| Apr 16, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: ON THE FIRST FLOOR EXIT 5 THE DOOR ON THE RIGHT, EXIT 4 THE DOOR ON THE RIGHT, EXIT 2 THE DOOR ON THE RIGHT ALSO EXIT 7 THE DOOR ON THE RIGHT ALL THESE DOORS WERE NOT CLOSING. #35692007K | Nov 7, 2025 POP/IN-VIO | $0 |
| Apr 16, 2025 | Construction CLASS - 2 RE-ISSUE #35678811K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED AT THE REAR OF THE AUDITORIUM ON THE LEFT SIDE THERE ARE CRACKS ON BOTH SIDES OF THE WINDOW. REMEDY: REPAIR AND/OR REP #35692005R | Nov 7, 2025 POP/IN-VIO | $0 |
| Mar 25, 2024 | Construction CLASS - 2 REISSUE#35673079X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT TIME OF MY INSPECTION I OBSERVED AT THE AUDITORIUM TO LEFT SIDE OF STAGE IN EXIT PASSAGEWAY A VERTICAL CRACK ON THE WALL APPROXIM #35678811K | May 3, 2024 POP/IN-VIO | $0 |
| Mar 22, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT EXIT "F" OUTSIDE MISSING MORTAR EXPOSING 1" OPENING BTWN CONCRETE STEPS.REMEDY:MAKE NECESSARY REPAIRS. #35673080N | Jun 21, 2023 POP/IN-VIO | $0 |
| Mar 22, 2023 | Construction CLASS - 2 REISSUE #35654719L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER-NOTED:AT AUDITORIUM LEFT OF STAGE IN EXIT PASSAGEWAY 10' VERTICAL CRACK ON WALL NEAR WINDOW.REMEDY:MAKE NECESSARY REPAIRS. #35673079X | Jun 21, 2023 POP/IN-VIO | $0 |
| May 11, 2022 | Construction CLASS - 2 REISSUE#35577481Y.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED OBSERVED DURING INSPECTION OF AUDITORIUM(LEFT OF STAGE)IN EXITPASSAGEWAY WINDOW AREA HAS A VERTICAL CRACK APPROX 10FT LONG.REMEDY:RE #35654719L | Oct 26, 2022 POP/IN-VIO | $0 |
| Jun 10, 2021 | Construction CLASS - 2 REISSUE#35442694J(8/02/2019)AT FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:AT AUDITORIUM APPROX 10'0 VERTICAL CRACK HEAR WINDOW TO EXIT IT.CEILING LACK ABOVE FROM MAIN AUDITORIUM ENTRANCE SHOW MAKE ST #35577481Y | Nov 24, 2021 POP/IN-VIO | $0 |
| Aug 2, 2019 | Construction CLASS - 2 REISSUE #35342207P FAILURE TO MAINTIAN BUILDING IN CODE COMPLIANT MANNER.NOTED: @AUDITORIUM APPROX 10' VERTICAL CRACK IN WALL NEAR WINDOW LEADING TO EXIT H @ LEFT SIDE OF THE STAGE. ALSO CELING LEAK ABOVE THE #35442694J | Jan 8, 2020 POP/IN-VIO | $0 |
| Jun 13, 2018 | Construction CLASS - 2 REISSUE NOV #35272245P NOTED: APPRX 10' VERTICAL CRACK AT WALL (WINDOW) LEADING TO EXIT FROM AUDITORIUM. RMDY: COMPLY WITH CODE. #35342207P | Oct 29, 2018 POP/IN-VIO | $0 |
| Jul 19, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NOTED;APPRPX 10 FT VERITCAL CRACK WAS OBSERVED ON WALL NEAR WINDOW AT CORRIDEOR LEADING TO EXIT FROM AUDITORIUM AT LEFTSIDE.REM:REPAIR #35272245P | Oct 16, 2017 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 9, 2026, 7:03 PM ET. BBL 3049940023.