2 floors · 4,630 sq ft · built 1931 · class K4 · owner of record: Goldberg Maxine
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 18 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-05 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 18, 2001 | IMMEDIATE EMERGENCY #010/01 | DOB VIOLATION - ACTIVE |
| Jan 16, 2001 | CONSTRUCTION #1802JW | DOB VIOLATION - ACTIVE |
| Dec 6, 1999 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: HAVING INSTALLED NEW ONE A/C UNIT ON ROOF REMEDY: OBTAIN PERMIT #18M01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 11, 2019 | C | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AT BUILDING VESTIBULE , 1st STORY | Jul 19, 2019 |
| Jul 11, 2019 | A | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT BUILDING VESTIBULE , 1st STORY | Oct 14, 2019 |
| Apr 1, 2019 | B | Apt 2F · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, APARTMENT AT EAST | May 6, 2019 |
| Apr 1, 2019 | A | Apt 2F · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, APARTMENT AT EAST | Jul 5, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 5:33 AM ET. BBL 3078200052.